DataBank Red Oak Data Center
Ellis County, TX
Project details
Capacity 168 MW reported. Status DFW10 operating; DFW13 planned. City . County Ellis. State TX. Grid .
Overview
DataBank's Red Oak campus page describes a 292-acre campus 21 miles south of Dallas, planned for eight two-story data centers. Phase 1 is four buildings and a 400 MW substation delivering up to 300 MW of critical IT power, with Phase 2 bringing the campus to 480 MW across eight buildings. DFW10 is listed at 3330 Batchler Rd., Red Oak, TX 75154, 200,000 IT square feet, 60 MW critical IT load. Data Center Dynamics reported DataBank filings for DFW11 and DFW12 at the Red Oak campus along Stainback Road in Ellis County, two two-story 425,170-square-foot buildings at $325 million each, and that DFW10 construction was set to run from February 2025 to August 2028. TDLR project TABS2026009183 names Databank Red Oak - DFW13, facility DFW13, Stainback Rd, Red Oak, TX 75154, Ellis County, two-story data center with office, 425,170 square feet, start 1 March 2026, completion 31 December 2027, estimated $325 million, owner DB Data Center Red Oak, LLC. Urbanize Dallas later noted DataBank had started construction on the 480 MW Red Oak campus of eight halls. Ellis County also maps Red Oak and Midlothian; Dallas County maps GigaPop Red Oak on Stainback Road.
The public map lists 2 map records. Reported campus capacity is 168 MW. Mix: 1 operating, 1 planned.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- DataBank Red Oak - DFW10 | 84 MW | operating | 32.53823, -96.73492
- DataBank Red Oak - DFW13 | 84 MW | planned | 32.5385, -96.73965
Related
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- GigaPop Red Oak 540 MW · planned · Dallas
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas 333.9 MW · planned · Dallas
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- Stream DFW VIII-X 90 MW · operating · Dallas
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Rowan Cinco 300 MW · planned · Medina
- ACS Fort Worth 350 MW · planned · Tarrant
- Aligned DFW03 Mansfield 86.4 MW · planned · Tarrant
- CyrusOne DFW7 84 MW · planned · Tarrant
- Meta Fort Worth 105 MW · operating · Tarrant
- QTS Fort Worth DC2 58.8 MW · operating · Tarrant
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Red Oak Campus - DataBank — DataBank, retrieved 2026-09-01
- DataBank files to develop two more data centers at upcoming Red Oak, Texas, campus — Data Center Dynamics, retrieved 2026-09-01
- Databank Red Oak - DFW13 — Texas Department of Licensing and Regulation TABS2026009183, retrieved 2026-09-01
- Powered Lands data center map