Meta El Paso Data Center | El Paso County, TX
Meta El Paso is a planned data-center campus in El Paso County, Texas.
The campus has ten buildings. Each building is listed at 98.8 MW, planned. Reported campus capacity is 988 MW. All ten buildings are planned.
Building 1 is at 31.99469, −106.35677. Building 2 is at 31.99468, −106.35491. Building 3 is at 31.99485, −106.35160, the eastern end of the row. Buildings 4 through 10 continue west along the same latitude, ending at Building 10 at 31.99500, −106.37098. The ten pins span about 1.1 miles east to west.
El Paso County is at the western tip of Texas, on the Rio Grande. El Paso is the county seat. New Mexico lies to the north and west. Chihuahua, Mexico, lies to the south. The Franklin Mountains run through the western part of the county. Interstate 10 crosses the county seat on the way west to Las Cruces and east toward Van Horn.
Capacity 988 MW reported. Status planned. City . County El Paso. State TX. Grid .
Buildings
- Meta El Paso - Building 1 | 98.8 MW | planned | 31.99469, -106.35677
- Meta El Paso - Building 2 | 98.8 MW | planned | 31.99468, -106.35491
- Meta El Paso - Building 3 | 98.8 MW | planned | 31.99485, -106.3516
- Meta El Paso - Building 4 | 98.8 MW | planned | 31.99479, -106.35318
- Meta El Paso - Building 5 | 98.8 MW | planned | 31.99494, -106.35833
- Meta El Paso - Building 6 | 98.8 MW | planned | 31.99486, -106.36005
- Meta El Paso - Building 7 | 98.8 MW | planned | 31.9949, -106.36278
- Meta El Paso - Building 8 | 98.8 MW | planned | 31.99493, -106.36551
- Meta El Paso - Building 9 | 98.8 MW | planned | 31.99496, -106.36824
- Meta El Paso - Building 10 | 98.8 MW | planned | 31.995, -106.37098
Sources
- Hello, El Paso! — Meta Data Centers, 2025-10-15, retrieved 2026-08-28
- Meta to invest $1.5 billion to build AI data center in El Paso — El Paso Matters, 2025-10-15, retrieved 2026-08-28
- Big things are happening, El Paso! — Meta Data Centers, 2026-03-26, retrieved 2026-08-28
- Meta to spend $10 billion on AI data center in El Paso, 1GW by 2028 — CNBC, 2026-03-26, retrieved 2026-08-28
- Meta El Paso Campus Data Center — Data Center Map, retrieved 2026-08-28
- El Paso Meta data center calls for $473 million gas-powered power plant — El Paso Matters, 2026-01-18, retrieved 2026-08-28
- Powered Lands data center map