Vantage TX12
Bexar County, TX
Project details
Capacity 96 MW reported. Status planned. City . County Bexar. State TX. Grid .
Overview
The Texas Department of Licensing and Regulation TABS project TABS2026001234 registers VANTAGE DATA CENTER (TX12) at 17420 Omicron Dr, San Antonio, as a two-story building with up to 96 MW of critical IT capacity on the TX1 campus. A related TDLR tenant-fit-out filing, TABS2026012091, describes TX12 tenant build-out of 96 MW of data modules at the same Omicron Drive address. Data Center Dynamics reported the TX12 filing at Omicron Drive and prior TX11 work at the same San Antonio campus, Vantage's second San Antonio hall on that campus. Omicron Drive sits in Texas Research Park on San Antonio's west side, the same park that maps CloudHQ SAT land at Omicron and Lambda and Microsoft SAT halls. Stream San Antonio III-VII is Stream's operating Military Drive campus in Bexar County: Stream's newsroom put a 135-acre, five-building campus at West Military Drive and Loop 1604 with an on-site 334 MW CPS Energy substation and a $400 million San Antonio III location page. QTS San Antonio DC1, Microsoft SAT11–13, and Microsoft SN7 complete the Bexar set. Medina County maps Rowan Cinco, a 300 MW Rowan campus on 440 acres near Lytle with a $900 million Medina County announcement, and Microsoft SAT Medina. The public map lists Vantage TX12 as one planned 96 MW building.
The public map lists one map record, Vantage TX12, 96 MW, planned. Reported campus capacity is 96 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Vantage TX12 | 96 MW | planned | 29.415485, -98.78889
Related
- Stream San Antonio III-VII 280 MW · operating · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- DataBank Red Oak 168 MW · DFW10 operating; DFW13 planned · Ellis
- GigaPop Red Oak 540 MW · planned · Dallas
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas 333.9 MW · planned · Dallas
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- ACS Fort Worth 350 MW · planned · Tarrant
- Aligned DFW03 Mansfield 86.4 MW · planned · Tarrant
- CyrusOne DFW7 84 MW · planned · Tarrant
- Meta Fort Worth 105 MW · operating · Tarrant
- QTS Fort Worth DC2 58.8 MW · operating · Tarrant
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- VANTAGE DATA CENTER (TX12) — Texas Department of Licensing and Regulation TABS2026001234, retrieved 2026-09-01
- Vantage files to build second San Antonio data center in Texas — Data Center Dynamics, retrieved 2026-09-01
- TX12 TFO — Texas Department of Licensing and Regulation TABS2026012091, retrieved 2026-09-01
- Powered Lands data center map