CloudHQ SAT
Bexar County, TX
Project details
Capacity 720 MW reported. Status planned. City . County Bexar. State TX. Grid ERCOT.
Overview
CloudHQ’s SAT campus sits west of San Antonio on the former University of Texas Health Science Center site. The company lists five planned halls totaling 3,023,300 square feet, 600 megawatts of published critical IT load, ready-for-service within 2027, four fiber laterals, and multiple on-site substations. The San Antonio Express-News reported on June 2, 2023, that a CloudHQ-affiliated LLC bought 123 acres of undeveloped land at Omicron and Lambda in Texas Research Park from the University of Texas board of regents, with site plans for four or five buildings bordering Microsoft’s campus. Data Center Dynamics said the tract is bounded by Lambda Drive and Omicron Drive across the street from Microsoft’s Bexar County facilities at 15000 Lambda Drive, just east of that campus, that UT still held about 58 undeveloped acres next door after moving science labs to the South Texas Medical Center, and that county filings sketched multiple configurations of four or five multi-story halls. CloudHQ was founded in 2016 by DuPont Fabros co-founder Hossein Fateh. Bexar County’s other mapped campuses in this directory include Microsoft SAT11–13, Microsoft SAT, Microsoft SN7, and QTS San Antonio DC1.
The public map lists 5 map records. Reported campus capacity is 720 MW. All 5 buildings are planned.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- CloudHQ SAT-1 | 144 MW | planned | 29.416967, -98.79985
- CloudHQ SAT-2 | 144 MW | planned | 29.41507, -98.798195
- CloudHQ SAT-3 | 144 MW | planned | 29.416283, -98.796844
- CloudHQ SAT-4 | 144 MW | planned | 29.414665, -98.79544
- CloudHQ SAT-5 | 144 MW | planned | 29.416641, -98.79462
Related
- Microsoft SAT11–13 243 MW · operating · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Stream DFW VIII-X 90 MW · operating · Dallas
- Aws Cipher Stingray 100 MW · planned · Andrews
- Project Lufkin 175 MW · planned · Angelina
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Meta Temple 197.6 MW · operating · Bell
- Rowan Temple 300 MW · planned · Bell
Sources
- CloudHQ SAT Campus — CloudHQ — retrieved 2026-09-01
- UT sells 123 acres in west Bexar County to data center provider — San Antonio Express-News — 2023-06-02 — retrieved 2026-09-01
- CloudHQ acquires more than 120 acres of land in San Antonio, Texas — Data Center Dynamics — 2023-06-06 — retrieved 2026-09-01
- Powered Lands data center map