Project Lufkin
Angelina County, TX
Project details
Capacity 175 MW reported. Status planned. City Lufkin. County Angelina. State TX. Grid ERCOT.
Overview
Project Lufkin is AmpZ’s (Amp Z Champion Data Center Holdings) planned campus at the former Southland/Abitibi paper mill just outside Lufkin city limits in Angelina County. The City of Lufkin’s FAQ says the project is still in planning and has not been approved for construction, estimates 30 permanent jobs and 500 construction jobs over the first several years, and notes the mill sits outside city zoning and permitting. AmpZ told the city the halls would use closed-loop cooling with about 500 gallons a day of treated water, comparable to three homes, and that Oncor industrial rate classes keep dedicated facility upgrades on that customer. State rules put data centers among the first loads curtailed when ERCOT needs to conserve power. The city said it would not receive sales or property tax from a site outside city limits, while the county tax base could rise. Data Center Dynamics, citing Angelina County records reported by the Lufkin Daily News, said Verdant Industries granted Amp Z Champion Data Center Holdings an option to buy about 1,041 acres at the mill. Company materials described a 55-megawatt on-site substation today, 175 megawatts of grid-connected capacity in 2026, 1.1 gigawatts by 2028, and a gigawatt of self-generation by 2029. Texas’s other mapped campuses already live in this directory include Stargate Milam.
The public map lists one map record, Project Lufkin Data Center, 175 MW, planned. Reported campus capacity is 175 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Project Lufkin Data Center | 175 MW | planned | 31.3579, -94.677475
Related
- Stargate Milam 1,200 MW · planned · Milam
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Stream DFW VIII-X 90 MW · operating · Dallas
- Aws Cipher Stingray 100 MW · planned · Andrews
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Meta Temple 197.6 MW · operating · Bell
- Rowan Temple 300 MW · planned · Bell
- Cloudhq Sat 720 MW · planned · Bexar
- Microsoft Sat 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft Sat 11 13 243 MW · operating · Bexar
- Microsoft Sn7 62.5 MW · operating · Bexar
- Qts San Antonio Dc1 63 MW · operating · Bexar
Sources
- DATA CENTER FREQUENTLY ASKED QUESTIONS — City of Lufkin — City of Lufkin, retrieved 2026-09-01
- Multi-gigawatt data center campus planned in East Texas — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map