Stargate Frontier Data Center | Shackelford County, TX
Stargate Frontier is a planned data-center campus in Shackelford County, Texas. It sits in ERCOT.
The campus has ten buildings. Each building is listed at 182 MW, planned. Reported campus capacity is 1,820 MW. All ten buildings are planned.
Building 1 is at 32.54105, −99.54557. Building 2 is at 32.54145, −99.54947. Building 3 is at 32.54065, −99.54166. Buildings 4 and 5 continue west of Building 2, at 32.54180, −99.55306 and 32.54215, −99.55678. Buildings 6 through 10 sit in a northern row, from Building 6 at 32.54550, −99.54013 to Building 10 at 32.54726, −99.55540.
Stargate Abilene is a related Stargate campus in Taylor County, about 13 miles southeast. It has eight buildings at 150 MW each. Buildings 1 and 2 are operating. Buildings 3 through 8 are planned. Stargate Abilene’s reported campus capacity is 1,200 MW. IREN Sweetwater is a planned campus in Nolan County, about 42 miles west-southwest, at 32.46384, −100.32996. Sweetwater 1 is listed at 1,400 MW, planned. Sweetwater 2 is listed at 600 MW, planned. Reported Sweetwater campus capacity is 2,000 MW.
Shackelford County is in west-central Texas. Albany is the county seat. Taylor County lies to the southeast. Nolan County lies to the southwest. The county is in ERCOT.
Capacity 1820 MW reported. Status planned. City . County Shackelford. State TX. Grid ERCOT.
Buildings
- Stargate Frontier - Building 1 | 182 MW | planned | 32.54105, -99.54557
- Stargate Frontier - Building 2 | 182 MW | planned | 32.54145, -99.54947
- Stargate Frontier - Building 3 | 182 MW | planned | 32.54065, -99.54166
- Stargate Frontier - Building 4 | 182 MW | planned | 32.5418, -99.55306
- Stargate Frontier - Building 5 | 182 MW | planned | 32.54215, -99.55678
- Stargate Frontier - Building 6 | 182 MW | planned | 32.5455, -99.54013
- Stargate Frontier - Building 7 | 182 MW | planned | 32.54614, -99.5439
- Stargate Frontier - Building 8 | 182 MW | planned | 32.54649, -99.54812
- Stargate Frontier - Building 9 | 182 MW | planned | 32.54686, -99.55173
- Stargate Frontier - Building 10 | 182 MW | planned | 32.54726, -99.5554
Related
Sources
- Vantage Data Centers Unveils Plans for ‘Frontier,’ a $25B Mega-campus in Texas — Vantage Data Centers, 2025-08-19, retrieved 2026-08-28
- Shackelford County (Frontier) Data Center Campus — Vantage Data Centers, retrieved 2026-08-28
- OpenAI, Oracle, and SoftBank expand Stargate — OpenAI, 2025-09-23, retrieved 2026-08-28
- NORI, proposed Air Permit 182467 / PSDTX1692 / GHGPSDTX266 — Texas Commission on Environmental Quality, 2025-12-17, retrieved 2026-08-28
- Vantage breaks ground on Texas gigawatt data center campus for OpenAI — Data Center Dynamics, 2025-12-15, retrieved 2026-08-28
- Vantage Data Centers and VoltaGrid Establish Partnership to Deploy More Than One Gigawatt of Power Generation — VoltaGrid, 2025-02-11, retrieved 2026-08-28
- DigitalBridge Group 3Q 2025 Earnings Presentation — SEC EDGAR, 2025-10-30, retrieved 2026-08-28
- Electric Generating Unit Standard Permit Technical Review, Registration 180842 — Texas Commission on Environmental Quality, 2025-07-17, retrieved 2026-08-28
- AI Data Centers: Investing in Communities, Powering the Future (Shackelford status) — Oracle, retrieved 2026-08-28
- Data Centers in Texas (TX301–TX310) — Texas Comptroller, retrieved 2026-08-28
- Powered Lands data center map