Stargate Abilene Data Center | Abilene, TX

Stargate Abilene is a Taylor County data center campus on the Powered Lands public map, recorded as eight verified building records rather than a single campus polygon. Each building is listed at 150 MW of reported capacity. Buildings 1 and 2 are operating. Buildings 3 through 8 are planned. Adding those eight figures produces 1,200 MW. That arithmetic is a sum of verified map records. It is not operating load, not contracted utility service, and not power that can be delivered to a customer.

The Building 1 pin sits near Abilene in Taylor County, Texas, at 32.50512, −99.78102. The remaining seven buildings form a tight cluster around that point. Those coordinates are public-map pins, not parcel centroids, and they do not by themselves prove site control.

Immediately south of this eight-building cluster are two additional verified records: Crusoe Abilene Building 9 (Microsoft) and Building 10 (Microsoft), each 450 MW planned. They are related nearby projects. They are not counted in the 1,200 MW Stargate sum.

Public-map details do not include developer, acres, or year. Those fields stay unknown on this page. The campus is in ERCOT. Nearest substation, interconnection queue position, and behind-the-meter versus grid service are unknown and need a land-and-power pass. Zoning, water, adjacent acreage, and county precedent are likewise unknown until that pass.

Verified project records are kept separate from unverified leads. Map presence does not establish interconnection rights, site control, or utility commitment. Reported capacity is not deliverable power.