Stargate Milam is a planned data-center campus in Milam County, Texas. It sits in ERCOT.
The campus has four buildings. Each building is listed at 300 MW, planned. Reported campus capacity is 1,200 MW. All four buildings are planned.
Building 1 is at 30.99625, −97.01069. Building 2 is at 30.99921, −97.01478. Building 3 is at 30.99929, −97.01218. Building 4 is at 30.99910, −97.00958. The four pins sit in a tight cluster in northern Milam County.
Riot Platforms Rockdale is an operating 700 MW campus in the same county, at 30.56359, −97.08498, about 30 miles south. Stargate Abilene is a related Stargate campus in Taylor County. It has eight buildings at 150 MW each. Buildings 1 and 2 are operating. Buildings 3 through 8 are planned. Stargate Abilene’s reported campus capacity is 1,200 MW.
Milam County is in central Texas. Cameron is the county seat. The county sits northeast of Austin along U.S. Highway 77 and the Little River. The county is in ERCOT.
Capacity 1200 MW reported. Status planned. City . County Milam. State TX. Grid ERCOT.
Buildings
- Stargate Milam - Building 1 | 300 MW | planned | 30.99625, -97.01069
- Stargate Milam - Building 2 | 300 MW | planned | 30.99921, -97.01478
- Stargate Milam - Building 3 | 300 MW | planned | 30.99929, -97.01218
- Stargate Milam - Building 4 | 300 MW | planned | 30.9991, -97.00958
Related
Sources
- SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas — Data Center Dynamics, retrieved 2026-08-28
- SB Energy to Build Stargate Data Center in Texas — SB Energy, retrieved 2026-08-28
- OpenAI Stargate's Milam, Texas, 'Freebird' data center to span 548,950 sq ft in first phase — Data Center Dynamics, 2026-04-22, retrieved 2026-08-28
- Stargate Milam County Data Center in Cameron | OpenAI — Data Center Map, retrieved 2026-08-28
- OpenAI Stargate Milam | AI Data Centers | Epoch AI — Epoch AI, retrieved 2026-08-28
- Powered Lands data center map