Riot Platforms Rockdale
Milam County, TX
Project details
Capacity 700 MW reported. Status operating. City . County Milam. State TX. Grid .
Overview
Riot’s Rockdale location page says the facility hosts 700 MW of developed capacity, uses immersion and air-cooled systems for Bitcoin mining and data-center operations, includes seven buildings, began construction in 2019 and was operational by 2020, and is Riot’s flagship Texas site with vertical integration to maintain substations independently. Riot announced on 16 January 2026 the fee-simple acquisition of 200 acres in Milam County, previously operated under a ground lease, for $96 million funded by the sale of about 1,080 bitcoin, unlocking the Rockdale Site for data-center development. The release says the site features a 700 MW interconnection, dedicated water, and fiber, and that Riot signed a data-center lease with AMD for an initial 25 MW of critical IT load beginning January 2026 and completing in May 2026, with an initial 10-year term expected to generate about $311 million, plus expansion options that could bring AMD to 200 MW of critical IT load. Riot intends to convert the full 700 MW of gross power at Rockdale for data-center tenants. Stargate Milam is Milam County’s other mapped campus, the live Stargate pin. Riot’s January 16, 2026, release says the 200-acre fee-simple buy was funded by selling about 1,080 bitcoin, that AMD’s initial 25 MW IT load is a 10-year lease with about $311 million of expected contract revenue, and that expansion and ROFR could take AMD to 200 MW. Stargate Milam is the live Milam County neighbor. The Rockdale page’s seven buildings and 2019–2020 build remain the operating campus description.
The public map lists one map record, Riot Platforms Rockdale, 700 MW, operating. Reported campus capacity is 700 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Riot Platforms Rockdale | 700 MW | operating | 30.56359, -97.08498
Related
- Stargate Milam 1,200 MW · planned · Milam
- Crusoe Abilene 900 MW · planned · Taylor
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Rockdale — Riot Platforms, retrieved 2026-09-01
- Riot Announces Fee Simple Acquisition of Land and First Data Center Lease with AMD at the Rockdale Site — Riot Platforms, retrieved 2026-09-01
- Powered Lands data center map