Rowan Temple
Bell County, TX
Project details
Capacity 300 MW reported. Status planned. City . County Bell. State TX. Grid ERCOT.
Overview
Rowan Digital Infrastructure broke ground on a 300-megawatt hyperscale campus on about 700 acres along Bob White Road in Temple, a minimum $700 million project with operations targeted for 2027 and power through Oncor. Temple City Council gave unanimous approval for 1707 and 2351 Bob White Road. CEO Charley Daitch said the new halls reuse utility and Rowan power infrastructure at the former Moriah Data Center at 2810 Bob White Road in Synergy Park, completed in 2023, vacated by its tenant in 2024, and being converted to a warehouse so the campus needs no new transmission or substation. Rowan was set up in 2021 by Quinbrook Infrastructure Partners and Birch Infrastructure; University Pension Plan Ontario is an investor, and Blackstone later took a significant minority stake. In July 2026 Rowan filed with the Texas Department of Licensing and Regulation for AUS02 Building 2 at 1855 Bob White Road, a $780 million single-story 500,000-square-foot hall with construction from August 2026 to August 2027. Rowan’s Temple page lists 700 acres and 300 megawatts. Bell County’s other mapped campus in this directory is Meta Temple.
The public map lists one map record, Rowan Temple Data Center, 300 MW, planned. Reported campus capacity is 300 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Rowan Temple Data Center | 300 MW | planned | 31.05745, -97.2979
Related
- Meta Temple 197.6 MW · operating · Bell
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Stream DFW VIII-X 90 MW · operating · Dallas
- Aws Cipher Stingray 100 MW · planned · Andrews
- Project Lufkin 175 MW · planned · Angelina
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Cloudhq Sat 720 MW · planned · Bexar
- Microsoft Sat 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft Sat 11 13 243 MW · operating · Bexar
- Microsoft Sn7 62.5 MW · operating · Bexar
- Qts San Antonio Dc1 63 MW · operating · Bexar
Sources
- Temple | 300 MW Hyperscale Data Center Campus | Texas — Rowan Digital — retrieved 2026-09-01
- Rowan Powers Texas Growth as Construction Begins on 300 MW Temple Data Center — Rowan Digital — retrieved 2026-09-01
- Rowan starts work on 300MW data center in Temple, Texas — Data Center Dynamics — retrieved 2026-09-01
- Rowan files for second building at data center campus in Temple, Texas — Data Center Dynamics — retrieved 2026-09-01
- Powered Lands data center map