Microsoft SAT11–13
Bexar County, TX
Project details
Capacity 243 MW reported. Status operating. City . County Bexar. State TX. Grid ERCOT.
Overview
Microsoft registered SAT11–14 with the Texas Department of Licensing and Regulation as project EABPRJB8824650 at 15000 Lambda Drive, San Antonio 78245, on August 24, 2018. The privately funded filing describes three single-story halls of about 225,000 square feet each, including about 14,000 square feet of support space per building, 675,000 square feet in all, estimated cost $62 million, start October 1, 2018, completion December 31, 2023, owner Microsoft, designer Corgan Associates. Data Center Dynamics has covered Microsoft’s continuing San Antonio filings and described the Texas Research Park campus at 15000 Lambda Drive, including completed SAT46 space of 79,385 square feet and a $1 billion plan for about one million square feet on 158 acres. CloudHQ SAT sits across Lambda Drive and Omicron Drive from that Microsoft campus. The public map lists SAT11, SAT12, and SAT13 as three operating buildings in this cluster, separate from the SAT15–17 halls at 3555 Westover Link. Microsoft opened its first South Central U.S. Azure region in Texas in 2008. Bexar County’s other mapped campuses in this directory include CloudHQ SAT, Microsoft SAT, Microsoft SN7, and QTS San Antonio DC1.
The public map lists 3 map records. Reported campus capacity is 243 MW. All 3 buildings are operating.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Microsoft SAT11 | 81 MW | operating | 29.415785, -98.80333
- Microsoft SAT12 | 81 MW | operating | 29.415771, -98.804535
- Microsoft SAT13 | 81 MW | operating | 29.41302, -98.8064
Related
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Stream DFW VIII-X 90 MW · operating · Dallas
- Aws Cipher Stingray 100 MW · planned · Andrews
- Project Lufkin 175 MW · planned · Angelina
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Meta Temple 197.6 MW · operating · Bell
- Rowan Temple 300 MW · planned · Bell
Sources
- Microsoft files for another data center in San Antonio, Texas — Data Center Dynamics, retrieved 2026-09-01
- MICROSOFT SAT11-14 — Texas Department of Licensing and Regulation EABPRJB8824650 — Texas Department of Licensing and Regulation, retrieved 2026-09-01
- Powered Lands data center map