Microsoft SAT
Bexar County, TX
Project details
Capacity 254 MW reported. Status SAT15 operating; SAT16 and SAT17 planned. City . County Bexar. State TX. Grid ERCOT.
Overview
Microsoft’s SAT15–17 cluster is at 3555 Westover Link in San Antonio. Texas Department of Licensing and Regulation project TABS2022026535 lists SAT15 Data Center as a 245,000-square-foot shell-and-finish-out with administrative space and five colo halls, owner Microsoft, estimated cost $215.9 million, start October 1, 2022, and completion May 1, 2026. Data Center Dynamics reported the SAT16 filing at the same address as another 245,000-square-foot, $215 million hall after SAT15 was filed there in August 2022, with work on SAT15 then aimed at the first quarter of 2024. TDLR project TABS2025001197 names SAT 17 at 3555 Westover Link, 245,000 square feet, estimated cost $215 million, start February 25, 2025, completion December 1, 2027, same shell-and-fit-out scope, owner address One Microsoft Way, Redmond. DCD placed the Westover Link campus less than two miles from a five-building SAT14 plan at 3545 Wiseman Boulevard totaling about 350,000 square feet and more than $200 million. The same filing story noted Microsoft plans for SAT80 and SAT81 at 18844 FM 1957 and a U.S. Gov Texas Azure region opened in 2017 after the 2008 South Central U.S. Azure region. Bexar County’s other mapped campuses in this directory include CloudHQ SAT, Microsoft SAT11–13, Microsoft SN7, and QTS San Antonio DC1.
The public map lists 3 map records. Reported campus capacity is 254 MW. Mix: 1 operating, 2 planned.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Microsoft SAT16 | 87 MW | planned | 29.471346, -98.699234
- Microsoft SAT17 | 87 MW | planned | 29.472126, -98.69963
- Microsoft SAT15 | 80 MW | operating | 29.47022, -98.69884
Related
- Microsoft SAT11–13 243 MW · operating · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Stream DFW VIII-X 90 MW · operating · Dallas
- Aws Cipher Stingray 100 MW · planned · Andrews
- Project Lufkin 175 MW · planned · Angelina
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Meta Temple 197.6 MW · operating · Bell
- Rowan Temple 300 MW · planned · Bell
Sources
- SAT15 Data Center — Texas Department of Licensing and Regulation TABS2022026535 — retrieved 2026-09-01
- Microsoft files for another data center in San Antonio, Texas — Data Center Dynamics — retrieved 2026-09-01
- SAT 17 — Texas Department of Licensing and Regulation TABS2025001197 — retrieved 2026-09-01
- Powered Lands data center map