QTS San Antonio DC1
Bexar County, TX
Project details
Capacity 63 MW reported. Status operating. City . County Bexar. State TX. Grid ERCOT.
Overview
QTS lists its San Antonio 2 campus at 8535 Potranco Road, San Antonio, Texas 78251, on 32 acres with more than 90 megawatts of published critical capacity and a purpose-built standard design, about 20 minutes from San Antonio International Airport. The company also points readers to its Fort Worth and South Dallas Texas campuses. Texas Department of Licensing and Regulation project TABS2021007232 names QTS SAT2-DC1 at that address as a three-story, 338,721-square-foot hall at Ingram and Potranco that can support 45 megawatts of critical power with a 9-megawatt day-one build, start April 1, 2021, completion April 1, 2022, owner QTS Data Centers, project closed. Data Center Dynamics reported the existing Potranco campus as about 37 acres with one building offering 90 megawatts at full build-out, and a separate QTS filing to subdivide a 48-acre tract southwest of Highway 211 and Potranco Road, a different nearby plot north of Microsoft’s Lambda campus. The same report said Amazon had completed one San Antonio hall on Potranco Road among three planned city sites. Bexar County’s other mapped campuses in this directory include CloudHQ SAT, Microsoft SAT, Microsoft SAT11–13, and Microsoft SN7.
The public map lists one map record, QTS San Antonio DC1, 63 MW, operating. Reported campus capacity is 63 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- QTS San Antonio DC1 | 63 MW | operating | 29.44916, -98.65314
Related
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Stream DFW VIII-X 90 MW · operating · Dallas
- Aws Cipher Stingray 100 MW · planned · Andrews
- Project Lufkin 175 MW · planned · Angelina
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Meta Temple 197.6 MW · operating · Bell
- Rowan Temple 300 MW · planned · Bell
Sources
- San Antonio — QTS Data Centers — retrieved 2026-09-01
- QTS SAT2-DC1 — Texas Department of Licensing and Regulation TABS2021007232 — retrieved 2026-09-01
- QTS files to subdivide land in San Antonio, Texas — Data Center Dynamics — retrieved 2026-09-01
- Powered Lands data center map