Aligned DFW03 Mansfield Data Center
Tarrant County, TX
Project details
Capacity 86.4 MW reported. Status planned. City . County Tarrant. State TX. Grid .
Overview
Aligned Data Centers announced on 19 February 2025 that it is expanding its DFW footprint with DFW-03 in Mansfield on a 27-acre site with an on-site substation, initial capacity as early as Q4 2025, adaptive modular infrastructure, and air and liquid cooling up to 350 kW per rack. City of Mansfield Mayor Michael Evans is quoted on a Roots for the Future Fund partnership. Data Center Dynamics reported the same Mansfield expansion and that Aligned filed for DFW03 with TDLR in May 2024: 3801 Britton Road, Tarrant County, 429,600 square feet, two-story, construction June 2024 to January 2027. TDLR project TABS2024018570 is the architectural-barriers record for ADC DFW03 at that Britton Road address. The public map lists one planned map record, Aligned DFW03 Mansfield, at 86.4 MW. Tarrant County also maps ACS Fort Worth's five planned halls near Hicks Field Road, the $2.1 billion ACS campus Chron and the Star-Telegram covered with Oncor planning a substation next door; CyrusOne DFW7 on Asphalt Drive, CyrusOne's first Fort Worth campus with CEO Eric Schwartz citing more than $2.4 billion of Texas capital; Meta Fort Worth at AllianceTexas; and QTS Fort Worth DC2 at 14100 Park Vista Boulevard.
The public map lists one map record, Aligned DFW03 Mansfield, 86.4 MW, planned. Reported campus capacity is 86.4 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Aligned DFW03 Mansfield | 86.4 MW | planned | 32.54982, -97.07486
Related
- Acs Fort Worth 350 MW · planned · Tarrant
- Cyrusone Dfw7 84 MW · planned · Tarrant
- Meta Fort Worth 105 MW · operating · Tarrant
- Qts Fort Worth Dc2 58.8 MW · operating · Tarrant
- Stream Dfw Viii X 90 MW · operating · Dallas
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
Sources
- Aligned Data Centers Expands DFW Footprint with New Data Center in Mansfield, TX — Aligned Data Centers, retrieved 2026-09-01
- Aligned plans second data center campus in Dallas Fort Worth, Texas — Data Center Dynamics, retrieved 2026-09-01
- ADC DFW03 Project Details — Texas Department of Licensing and Regulation TABS2024018570, retrieved 2026-09-01
- Powered Lands data center map