QTS Fort Worth DC2 Data Center | Fort Worth, TX
QTS Fort Worth DC2 is an operating data-center campus in Tarrant County, Texas. It sits in ERCOT.
The campus has one map record. QTS Fort Worth DC2 is listed at 58.8 MW, operating, at 32.98750, −97.25877. Reported campus capacity is 58.8 MW. The record is operating.
Meta Fort Worth is an operating campus in Tarrant County. ACS Fort Worth is a planned campus in Tarrant County. QTS Irving is an operating campus in Dallas County.
Tarrant County is in the Dallas–Fort Worth metro. Fort Worth is the county seat. The campus is in ERCOT.
Capacity 58.8 MW reported. Status operating. City Fort Worth. County Tarrant. State TX. Grid ERCOT.
Buildings
- QTS Fort Worth DC2 | 58.8 MW | operating | 32.9875, -97.25877
Related
Sources
- QTS FTW1 DC2 — TDLR TABS2024010121 — Texas Department of Licensing and Regulation, retrieved 2026-08-28
- Irving — QTS Data Centers — QTS, retrieved 2026-08-28
- Powered Lands data center map