Stream San Antonio III-VII Data Center | Bexar County, TX
Stream Data Centers announced on 26 June 2024 that it had broken ground on a 135-acre hyperscale campus in San Antonio, planned for up to five buildings and 1.5 million square feet supporting 200 MW of IT capacity at full build, with the first 300,000-square-foot building scheduled for occupancy in the second quarter of 2025. The newsroom release places the campus at West Military Drive and Loop 1604 and says an on-site 334 MW CPS Energy substation will serve the site, describing five 40 MW buildings. Stream’s San Antonio III location page lists 11203 Military Drive W, San Antonio, Texas 78251, a $400 million investment, 200 MW at full build, and first facility SATB1 fully leased at 300,000 square feet with that same on-site 334 MW CPS substation. Data Center Dynamics reported on 28 June 2024 the same 135-acre, 200 MW, five-building campus at 11203 W Military Drive as Stream’s third San Antonio campus, with first 300,000-square-foot, 40 MW occupancy in Q2 2025. The public map records a single operating hall named Stream Data Center: San Antonio III - VII at 280 MW. Bexar County also maps [Vantage TX12](/data-centers/texas/bexar/vantage-tx12), [CloudHQ SAT](/data-centers/texas/bexar/cloudhq-sat), [Microsoft SAT](/data-centers/texas/bexar/microsoft-sat), [Microsoft SAT11–13](/data-centers/texas/bexar/microsoft-sat-11-13), [Microsoft SN7](/data-centers/texas/bexar/microsoft-sn7), and [QTS San Antonio DC1](/data-centers/texas/bexar/qts-san-antonio-dc1); Medina County maps [Rowan Cinco](/data-centers/texas/medina/rowan-cinco) and [Microsoft SAT Medina](/data-centers/texas/medina/microsoft-sat-medina).
The public map lists one building, Stream Data Center: San Antonio III - VII, 280 MW, operating. Reported campus capacity is 280 MW.
Capacity 280 MW reported. Status operating. City . County Bexar. State TX. Grid .
Buildings
- Stream Data Center: San Antonio III - VII | 280 MW | operating | 29.448698, -98.712685
Related
- Vantage TX12
- CloudHQ SAT
- Microsoft SAT
- Microsoft SAT11–13
- Microsoft SN7
- QTS San Antonio DC1
- Rowan Cinco
- Microsoft SAT Medina
- Red Oak
- Midlothian
- DataBank Red Oak
- GigaPop Red Oak
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas
- PowerCampus Dallas Building 1
- NTT Dallas TX4
- ACS Fort Worth
- Aligned DFW03 Mansfield
- CyrusOne DFW7
- Meta Fort Worth
- QTS Fort Worth DC2
- Stream DFW VIII-X
- Crusoe Abilene
- Stargate Abilene
- Stargate Frontier
- Stargate Milam
- QTS Turkey
- Meta El Paso
- AWS Comanche Peak
Sources
- Stream Data Centers Breaks Ground on New Hyperscale Data Center Campus in San Antonio — Stream Data Centers, retrieved 2026-09-01
- Data Centers San Antonio III — Stream Data Centers, retrieved 2026-09-01
- Stream breaks ground on third data center campus in San Antonio, Texas — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map