Stream San Antonio III-VII
Bexar County, TX
Project details
Capacity 280 MW reported. Status operating. City . County Bexar. State TX. Grid .
Overview
Stream Data Centers announced on 26 June 2024 that it had broken ground on a 135-acre hyperscale campus in San Antonio, planned for up to five buildings and 1.5 million square feet supporting 200 MW of IT capacity at full build, with the first 300,000-square-foot building scheduled for occupancy in the second quarter of 2025. The newsroom release places the campus at West Military Drive and Loop 1604 and says an on-site 334 MW CPS Energy substation will serve the site, describing five 40 MW buildings. Stream’s San Antonio III location page lists 11203 Military Drive W, San Antonio, Texas 78251, a $400 million investment, 200 MW at full build, and first facility SATB1 fully leased at 300,000 square feet with that same on-site 334 MW CPS substation. Data Center Dynamics reported on 28 June 2024 the same 135-acre, 200 MW, five-building campus at 11203 W Military Drive as Stream’s third San Antonio campus, with first 300,000-square-foot, 40 MW occupancy in Q2 2025. The public map records a single operating hall named Stream Data Center: San Antonio III - VII at 280 MW. Bexar County also maps Vantage TX12, CloudHQ SAT, Microsoft SAT, Microsoft SAT11–13, Microsoft SN7, and QTS San Antonio DC1; Medina County maps Rowan Cinco and Microsoft SAT Medina.
The public map lists one map record, Stream Data Center: San Antonio III - VII, 280 MW, operating. Reported campus capacity is 280 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Stream Data Center: San Antonio III - VII | 280 MW | operating | 29.448698, -98.712685
Related
- Vantage TX12 96 MW · planned · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- DataBank Red Oak 168 MW · DFW10 operating; DFW13 planned · Ellis
- GigaPop Red Oak 540 MW · planned · Dallas
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas 333.9 MW · planned · Dallas
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- ACS Fort Worth 350 MW · planned · Tarrant
- Aligned DFW03 Mansfield 86.4 MW · planned · Tarrant
- CyrusOne DFW7 84 MW · planned · Tarrant
- Meta Fort Worth 105 MW · operating · Tarrant
- QTS Fort Worth DC2 58.8 MW · operating · Tarrant
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Stream Data Centers Breaks Ground on New Hyperscale Data Center Campus in San Antonio — Stream Data Centers, retrieved 2026-09-01
- Data Centers San Antonio III — Stream Data Centers, retrieved 2026-09-01
- Stream breaks ground on third data center campus in San Antonio, Texas — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map