PowerCampus Dallas Building 1 Data Center | Dallas County, TX
Data Center Dynamics reported that Skybox Datacenters had started work on the first building of its PowerCampus Dallas site. DCD said the 270,900-square-foot facility was estimated at about $85 million in state planning documents, with delivery anticipated in early 2026, and that PowerCampus Dallas would total 300 MW and 1 million square feet across 115 acres in the Lancaster area of Dallas. Bandera Ventures acquired the site at South Dallas Avenue and Old [Red Oak](/data-centers/texas/ellis/red-oak) Road, east of Interstate 35E, in April 2023. Dallas Innovates reported the same campus in Lancaster as a partnership of Skybox Datacenters, Bandera Ventures, and Principal Asset Management, up to 300 MW with a private on-site substation and up to 1 million square feet, quoting Skybox CEO Rob Morris on PowerCampus Dallas. Urbanize Dallas placed [GigaPop Red Oak](/data-centers/texas/dallas/gigapop-red-oak) 24 miles from this Lancaster campus. The public map lists one planned hall, PowerCampus Dallas - Building 1, at 108 MW. [QTS South Dallas](/data-centers/texas/dallas/qts-south-dallas), [QTS South Dallas DC3](/data-centers/texas/dallas/qts-south-dallas-dc3), and [Stream Wilmer II](/data-centers/texas/dallas/stream-wilmer-ii) sit in Wilmer; GigaPop Red Oak, [DataBank Red Oak](/data-centers/texas/ellis/databank-red-oak), and Red Oak continue the corridor into Ellis County.
The public map lists one building, PowerCampus Dallas - Building 1, 108 MW, planned. Reported campus capacity is 108 MW.
Capacity 108 MW reported. Status planned. City . County Dallas. State TX. Grid .
Buildings
- PowerCampus Dallas - Building 1 | 108 MW | planned | 32.56889, -96.76749
Related
- QTS South Dallas
- Stream Wilmer II
- GigaPop Red Oak
- QTS South Dallas DC3
- NTT Dallas TX4
- Stream DFW VIII-X
- Red Oak
- DataBank Red Oak
- Midlothian
- Stream San Antonio III-VII
- Vantage TX12
- CloudHQ SAT
- Microsoft SAT
- Microsoft SAT11–13
- Microsoft SN7
- QTS San Antonio DC1
- Microsoft SAT Medina
- Rowan Cinco
- ACS Fort Worth
- Aligned DFW03 Mansfield
- CyrusOne DFW7
- Meta Fort Worth
- QTS Fort Worth DC2
- Crusoe Abilene
- Stargate Abilene
- Stargate Frontier
- Stargate Milam
- QTS Turkey
- Meta El Paso
- AWS Comanche Peak
Sources
- Skybox starts work at 300MW data center campus in Dallas, Texas — Data Center Dynamics, retrieved 2026-09-01
- Skybox Datacenters Begins Work on Massive Data Center in Southern Dallas County — Dallas Innovates, retrieved 2026-09-01
- Powered Lands data center map