Capacity 540 MW reported. Status planned. City . County Dallas. State TX. Grid .
Overview
Urbanize Dallas reported that Lincoln Property Co., Gigabit Fiber, and Tradition Holdings formed a partnership for a South Dallas data center campus dubbed GigaPop: more than 800,000 square feet across four buildings and up to 540 megawatts of power, on a 131-acre entitled lot at 1745 Stainback Road in Red Oak, Texas, with construction scheduled to commence that quarter. Designed for cloud and artificial intelligence users, the $1 billion project will provide edge colocation, dark fiber, and carrier-class IP transport that Gigabit Fiber CEO Tom Spackman said would benefit other sites underway in the area. Its first component will be a 2 MW facility totaling 7,500 square feet. Urbanize places the site 4 miles east of Interstate 35 and 4 miles west of Interstate 45 along Loop 9, and 24 miles from PowerCampus Dallas in Lancaster. Lincoln Executive Vice President Ryan Sullivan told Urbanize the South Dallas submarket had multiple projects underway that will deliver more than 1.5 gigawatts of capacity, with some 678 megawatts already under construction. The North Texas Semiconductor Innovation Consortium partner page describes the same GigaPop development as a $1 billion, 800,000-square-foot cloud-and-AI facility with construction described as starting in early 2025. The 540 MW figure matches the public map. Ellis County maps DataBank Red Oak and Red Oak on the same corridor.
The public map lists one map record, GigaPop Red Oak, 540 MW, planned. Reported campus capacity is 540 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- GigaPop Red Oak | 540 MW | planned | 32.5371, -96.72787
Related
- Stream Wilmer II
- QTS South Dallas 333.9 MW · planned · Dallas
- QTS South Dallas DC3
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- Stream DFW VIII-X 90 MW · operating · Dallas
- DataBank Red Oak 168 MW · DFW10 operating; DFW13 planned · Ellis
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Rowan Cinco 300 MW · planned · Medina
- ACS Fort Worth 350 MW · planned · Tarrant
- Aligned DFW03 Mansfield 86.4 MW · planned · Tarrant
- CyrusOne DFW7 84 MW · planned · Tarrant
- Meta Fort Worth 105 MW · operating · Tarrant
- QTS Fort Worth DC2 58.8 MW · operating · Tarrant
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Lincoln Property JV Eyes $1B Data Center Campus — Urbanize Dallas, retrieved 2026-09-01
- GigaPop Date Center Development — North Texas Semiconductor Innovation Consortium, retrieved 2026-09-01
- Powered Lands data center map