Soluna Project Kati
Willacy County, TX
Project details
Capacity 166 MW reported. Status planned. City . County Willacy. State TX. Grid ERCOT.
Overview
Soluna’s Project Kati page describes a soon-to-be 166 MW Texas data center connected to a wind farm with excess energy, named for the Hungarian scientist Kati Karikó, and Soluna’s second greenfield project in Texas. Soluna says the plant was not selling all the power it generated because the grid was overloaded or congested, and that Soluna plans to buy a majority of that excess energy and ramp demand up or down to support the grid. Business Wire’s 10 February 2026 release is titled Soluna Begins Energization of Project Kati 1, adding 83 MW to total capacity. The Rio Grande Valley Business Journal reported in January 2026 that Soluna was moving Project Kati 2 forward in Willacy County at the Las Majadas Wind Farm, with Kati 2 planned in two phases totaling 100 MW of wind power, and distinguished that Willacy cluster from Cameron County projects Ellen and Hedy. This page is the Willacy County Kati pin at Las Majadas, not Hedy’s 120 MW two-phase wind deal and not Dorothy 1 in Briscoe County. Willacy County’s other mapped campus is Soluna Project Hedy.
The public map lists one map record, Soluna Project Kati, 166 MW, planned. Reported campus capacity is 166 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Soluna Project Kati | 166 MW | planned | 26.37778, -97.5874
Related
- Soluna Project Hedy 120 MW · planned · Willacy
- Beacon Point 1,000 MW · planned · Nueces
- Soluna Project Gladys 150 MW · planned · Nueces
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- Eneus Energy Cameron 2,000 MW · planned · Cameron
- Soluna Project Ellen 100 MW · planned · Cameron
- Soluna Project Rosa 187 MW · planned · Cameron
- Cipher Reveille 70 MW · planned · La Salle
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Project Kati — Soluna, retrieved 2026-09-01
- Soluna Begins Energization of Project Kati 1, adding 83 MWs to Total Capacity — Business Wire, retrieved 2026-09-01
- Willacy County data center expansion tied to AI demand — Rio Grande Valley Business Journal, retrieved 2026-09-01
- Powered Lands data center map