Soluna Project Gladys
Nueces County, TX
Project details
Capacity 150 MW reported. Status planned. City . County Nueces. State TX. Grid ERCOT.
Overview
Soluna announced on 26 August 2025 that it had reached one gigawatt of clean-computing projects in operation, construction, or development with the launch of a solar-powered northern Texas site and Project Gladys, a wind-powered facility in the southeast of the state. Soluna said Project Gladys is a 150 MW facility co-located with a 226 MW wind farm, developed with a U.S. independent power producer managing more than $40 billion in assets and more than 80 energy facilities, and named for mathematician Dr. Gladys West. The company said Gladys was advancing through land acquisition, power-contract negotiation, and ERCOT interconnection planning, and that it would next complete definitive power-purchase agreements, land agreements, and ERCOT planning. Soluna’s Q2 2026 business-update exhibit later said Gladys, among other pipeline sites, was being advanced outside ERCOT’s Large Flexible Load Batch study, using a sub-75 MW interconnection pathway, while land due diligence and PPA negotiations continued. This page is Gladys in Nueces County, a 150 MW wind-colocation pin, not a West Texas mining hall and not Hut 8’s Beacon Point campus in the same county. Nueces County’s other mapped campus is Beacon Point.
The public map lists one map record, Soluna Project Gladys, 150 MW, planned. Reported campus capacity is 150 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Soluna Project Gladys | 150 MW | planned | 27.58049, -97.6401
Related
- Beacon Point 1,000 MW · planned · Nueces
- Soluna Project Hedy 120 MW · planned · Willacy
- Soluna Project Kati 166 MW · planned · Willacy
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- Eneus Energy Cameron 2,000 MW · planned · Cameron
- Soluna Project Ellen 100 MW · planned · Cameron
- Soluna Project Rosa 187 MW · planned · Cameron
- Cipher Reveille 70 MW · planned · La Salle
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Soluna Surpasses One Gigawatt of Clean Computing Projects with Launch of Two New Sites — Soluna, retrieved 2026-09-01
- Soluna Presents Q2 2026 Highlights & Business Update (SEC exhibit) — Soluna / SEC, retrieved 2026-09-01
- Powered Lands data center map