Soluna Project Ellen
Cameron County, TX
Project details
Capacity 100 MW reported. Status planned. City . County Cameron. State TX. Grid ERCOT.
Overview
Business Wire reported that Soluna is expanding renewable-powered AI and Bitcoin computing with a new 100 MW site, Project Ellen, co-located with a South Texas wind farm under a power term sheet. The public map lists one planned map record, Soluna Project Ellen, at 100 MW in Cameron County. Data Center Dynamics reported on 18 November 2025 that Soluna completed a 48 MW expansion at Project Dorothy 2 in West Texas, bringing that campus to 100 MW behind the meter at a 150 MW wind farm, and listed Project Ellen among 11 sites in various stages of development alongside Project Rosa, Project Kati, Project Hedy, and Project Annie, with a long-term pipeline of 19 projects and up to 2.8 GW. Eneus Energy Cameron is the 2 GW RGV / Harlingen planning pin in the same county; Soluna Project Rosa is the other Soluna Cameron record. Soluna names sites after pioneering women in science. The 100 MW figure on the map matches the Business Wire site size for Ellen. The public map lists one planned map record in Cameron County at that 100 MW campus total.
The public map lists one map record, Soluna Project Ellen, 100 MW, planned. Reported campus capacity is 100 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Soluna Project Ellen | 100 MW | planned | 26.2517, -97.4894
Related
- Soluna Project Rosa 187 MW · planned · Cameron
- Eneus Energy Cameron 2,000 MW · planned · Cameron
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Soluna to Expand Renewable-Powered AI & Bitcoin Computing With New 100MW Site — Business Wire, retrieved 2026-09-01
- Soluna completes expansion of Project Dorothy 2 site in West Texas, adding 48MW — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map