Eneus Energy Cameron
Cameron County, TX
Project details
Capacity 2000 MW reported. Status planned. City . County Cameron. State TX. Grid .
Overview
Eneus Energy’s RGV data-center page places the project in an initial planning and evaluation phase on a 1,785-acre site in Cameron County, Texas, with up to 2 GW of total power capacity and a current design for 16 typically sized data halls, proximity to nine metro fiber providers within ten miles, a planned 765 kV transmission line, and closed-cycle cooling planned to use locally sourced reclaimed wastewater. The page cites a Mangum Economics study dated 4 August 2025 for RGV Property Group projecting more than $14 billion of capital investment into Cameron County and about 1,000 jobs including 360 data-center positions through 2045. Data Center Dynamics reported on 5 February 2026 that UK-based Eneus is looking to develop a 2 GW campus spanning 16 data halls across 1,785 acres, supplied by a planned 765 kV line, and that RGV Property Group signed an option in July 2025 covering about 1,775 acres near Valley International Airport. DCD said an October letter to the Public Utility Commission of Texas stated Eneus had secured up to 1 GW of interconnection capacity for the RGV campus, and that Cameron County Judge Eddie Trevino said no formal local proposal had been submitted. The Rio Grande Valley Business Journal reported a massive Harlingen-area campus planned by Eneus Energy on 25 November 2025. The public map lists one planned map record at 2,000 MW. Soluna Project Ellen and Soluna Project Rosa are Cameron County’s other mapped campuses.
The public map lists one map record, Eneus Energy Cameron Data Center, 2,000 MW, planned. Reported campus capacity is 2,000 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Eneus Energy Cameron Data Center | 2000 MW | planned | 26.226423, -97.63307
Related
- Soluna Project Ellen 100 MW · planned · Cameron
- Soluna Project Rosa 187 MW · planned · Cameron
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- The RGV Data Center Project — Eneus Energy, retrieved 2026-09-01
- Eneus Response to Staff’s Questions on Project No. 58481 — Public Utility Commission of Texas, retrieved 2026-09-01
- 2GW data center could be developed in Cameron County, Texas — Data Center Dynamics, retrieved 2026-09-01
- Massive data center planned for Harlingen by Eneus Energy — Rio Grande Valley Business Journal, retrieved 2026-09-01
- Powered Lands data center map