Cipher Reveille
La Salle County, TX
Project details
Capacity 70 MW reported. Status planned. City Cotulla. County La Salle. State TX. Grid ERCOT.
Overview
Cipher Mining’s Q3 2024 investor exhibit names Reveille in Cotulla, Texas, at 70 MW of initial approved capacity with potential to expand to 200 MW, and places the site in ERCOT load zone LZ_South. On the Q1 2026 earnings call, Cipher said Reveille has ERCOT interconnection approval for 70 gross megawatts, that substation work has started, and that energization is targeted for the third quarter of 2027. Cipher Digital’s infrastructure page lists Reveille at 70 MW with a 2027 Q3 energization timeline. The 4 August 2026 business update repeats ERCOT interconnection approved for 70 gross MW, substation development initiated, HPC hosting-lease discussions, and Q3 2027 target energization. Cotulla is the city on Cipher’s exhibit. Reveille is Cipher’s near-term South Texas interconnection pin, earlier than the 2028 McLennan and Mikeska 500 MW pipeline sites. Cipher’s infrastructure table lists Reveille under pipeline capacity at 70 MW with a 2027 Q3 energization date, matching the earnings-call interconnection figure. The Q2 2026 exhibit repeats 70 MW gross, substation work underway, and HPC hosting-lease discussions. Cotulla and ERCOT LZ_South come from the 2024 exhibit; the 200 MW expansion case remains a Cipher-stated potential, not a second mapped hall.
The public map lists one map record, Cipher Reveille, 70 MW, planned. Reported campus capacity is 70 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Cipher Reveille | 70 MW | planned | 28.41871, -99.29763
Related
- Cloudhq Sat 720 MW · planned · Bexar
- Soluna Project Rosa 187 MW · planned · Cameron
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- Eneus Energy Cameron 2,000 MW · planned · Cameron
- Soluna Project Ellen 100 MW · planned · Cameron
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream Dfw Viii X 90 MW · operating · Dallas
Sources
- Cipher Mining Q3 2024 business update exhibit (Reveille 70 MW Cotulla) — U.S. Securities and Exchange Commission, retrieved 2026-09-01
- Cipher Mining (CIFR) Q1 2026 Earnings Transcript — The Motley Fool, retrieved 2026-09-01
- Infrastructure — Cipher Digital, retrieved 2026-09-01
- Cipher Digital Q2 2026 Business Update (SEC exhibit) — Cipher Digital, retrieved 2026-09-01
- Powered Lands data center map