Beacon Point
Nueces County, TX
Project details
Capacity 1000 MW reported. Status planned. City . County Nueces. State TX. Grid ERCOT.
Overview
Hut 8’s Beacon Point page describes a multi-phase, multi-tenant AI data-center campus in Nueces County with interconnection and site approvals secured for 1,000 MW of capacity on 525 acres. Hut 8 says the first two phases are expected to represent about $17 billion of combined capital investment, about 1,900 construction jobs, and about 230 permanent operations roles, that no municipal water will be used for cooling, and that the campus is not designed for cryptocurrency mining. Hut 8 announced on 20 July 2026 a second 15-year, 352 MW IT lease that doubles an existing high-investment-grade tenant’s contracted capacity at Beacon Point to 704 MW and fully commercializes the campus against 1,000 MW of utility capacity under an AEP Texas interconnection. The release puts Phase 2 base-term contract value at $9.8 billion, campus-level base-term value at $19.6 billion, initial Phase 2 data-hall delivery in the second quarter of 2028, and initial energization still scheduled for the first quarter of 2027. Data Center Dynamics reported Hut 8 signing a 352 MW lease with an unnamed hyperscaler in Texas. Nueces County’s other mapped campus is Soluna Project Gladys.
The public map lists 2 map records. Reported campus capacity is 1,000 MW. All 2 buildings are planned.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Beacon Point - Phase 1 | 500 MW | planned | 27.83594, -97.61026
- Beacon Point - Phase 2 | 500 MW | planned | 27.83594, -97.61026
Related
- Soluna Project Gladys 150 MW · planned · Nueces
- Soluna Project Hedy 120 MW · planned · Willacy
- Soluna Project Kati 166 MW · planned · Willacy
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- Eneus Energy Cameron 2,000 MW · planned · Cameron
- Soluna Project Ellen 100 MW · planned · Cameron
- Soluna Project Rosa 187 MW · planned · Cameron
- Cipher Reveille 70 MW · planned · La Salle
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Beacon Point — Hut 8, retrieved 2026-09-01
- Hut 8 Fully Commercializes 1 GW Beacon Point AI Data Center Campus with Second 352 MW IT Lease — PR Newswire, retrieved 2026-09-01
- Hut 8 signs 352MW lease with unnamed hyperscaler in Texas — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map