Soluna Project Hedy
Willacy County, TX
Project details
Capacity 120 MW reported. Status planned. City . County Willacy. State TX. Grid ERCOT.
Overview
Soluna announced on 8 April 2025 a term sheet for power for Project Hedy, a 120 MW data center co-located with a 200 MW wind farm in South Texas. The company said Hedy will be developed in two 60 MW phases using excess wind for Bitcoin mining, AI, and machine-learning loads, and that with Hedy Soluna expected more than 598 MW of capacity in operation, construction, or development. Soluna named the project for inventor Hedy Lamarr and said it would next finalize definitive power-purchase agreements, land agreements, and the ERCOT planning process. CEO John Belizaire tied the site to Cameron County wind resources. Data Center Dynamics reported the same 120 MW, two-phase Hedy deal next to a 200 MW South Texas wind farm and likewise placed development in Cameron County. The Rio Grande Valley Business Journal later listed Project Hedy among Soluna’s planned Cameron County wind-colocated campuses, separate from Project Kati at Las Majadas in Willacy County. The public map’s Hedy pin is in Willacy County at 120 MW planned, even though Soluna’s term sheet and DCD locate the wind farm in Cameron County. This page is Hedy, not Project Kati at Las Majadas and not Dorothy 1 in Briscoe County. Willacy County’s other mapped campus is Soluna Project Kati.
The public map lists one map record, Soluna Project Hedy, 120 MW, planned. Reported campus capacity is 120 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Soluna Project Hedy | 120 MW | planned | 26.32319, -97.585
Related
- Soluna Project Kati 166 MW · planned · Willacy
- Beacon Point 1,000 MW · planned · Nueces
- Soluna Project Gladys 150 MW · planned · Nueces
- Stream San Antonio III-VII 280 MW · operating · Bexar
- Microsoft SN7 62.5 MW · operating · Bexar
- CloudHQ SAT 720 MW · planned · Bexar
- QTS San Antonio DC1 63 MW · operating · Bexar
- Microsoft SAT 254 MW · SAT15 operating; SAT16 and SAT17 planned · Bexar
- Microsoft SAT11–13 243 MW · operating · Bexar
- Vantage TX12 96 MW · planned · Bexar
- Eneus Energy Cameron 2,000 MW · planned · Cameron
- Soluna Project Ellen 100 MW · planned · Cameron
- Soluna Project Rosa 187 MW · planned · Cameron
- Cipher Reveille 70 MW · planned · La Salle
- Rowan Cinco 300 MW · planned · Medina
- Microsoft SAT Medina 228 MW · operating, planned · Medina
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Soluna Strengthens Texas Presence with New 120MW Wind-Powered Data Center Project — Business Wire, retrieved 2026-09-01
- Soluna secures wind supply deal for 120MW crypto data center in Texas — Data Center Dynamics, retrieved 2026-09-01
- Willacy County data center expansion tied to AI demand — Rio Grande Valley Business Journal, retrieved 2026-09-01
- Powered Lands data center map