Hut 8 Salt Creek
Reeves County, TX
Project details
Capacity 63 MW reported. Status operating. City . County Reeves. State TX. Grid ERCOT.
Overview
Hut 8 Salt Creek is the 63 MW operating pin near Orla on the Reeves County public map. Hut 8 announced on 27 February 2024 that it had started construction of a 63 MW greenfield digital-asset mining site it named in Culberson County, Texas, expecting miners online in the second quarter of 2024. The company said the site could host up to about 3.6 EH/s if current-generation miners were deployed, that all-in design-and-build cost was expected to be less than $275,000 per megawatt versus a roughly $460,000-per-megawatt acquisition benchmark in the area, and that the Culberson County project created optionality to expand self-mining or move activity from Granbury, Texas, and Kearney, Nebraska. Hut 8 expected to build the 63 MW site for $17.3 million or less. On 16 April 2024 Hut 8 reported energization of one third of the 63 MW Salt Creek site, 78 days after breaking ground, after relocating more than 25,000 miners from Kearney and Granbury in eight days and deploying Reactor, its energy-curtailment software, so miners hash when profitable. CEO Asher Genoot said energy-price outlooks at the site still pointed to about a 30 percent lower cost to mine relative to those hosted sites. Datacenters.com catalogs Hut 8 Salt Creek near Orla and repeats the April 2024 63 MW energization. Company materials name Culberson County; the public-map county field used for this page is Reeves. Reeves County’s other mapped campus in this directory is Core Scientific Pecos Cottonwood.
The public map lists one map record, Hut 8 Salt Creek (Crypto mining), 63 MW, operating. Reported campus capacity is 63 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Hut 8 Salt Creek (Crypto mining) | 63 MW | operating | 31.85, -103.92
Related
- Core Scientific Pecos Cottonwood 600 MW · Cottonwood Buildings 1–3 operating; AI Data Hall 1 planned · Reeves
- Cipher Odessa 207 MW · operating · Ector
- Texas Critical Ector 250 MW · planned · Ector
- AWS GW Ranch 4,000 MW · planned · Pecos
- Project Horizon 2,000 MW · planned · Pecos
- Hut 8 King Mountain 280 MW · operating · Upton
- Ionic Digital Cedarvale 234 MW · operating · Ward
- AWS Cipher Black Pearl 300 MW · planned · Winkler
- AWS Cipher Stingray 100 MW · planned · Andrews
- FO Permian Partners 150 MW · planned · Midland
- Cipher Colchis 1,000 MW · planned · Tom Green
- Meta El Paso 988 MW · planned · El Paso
- QTS Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- AWS Comanche Peak 715 MW · planned · Somervell
- crusoe abilene 900 MW · planned · Taylor
- stargate abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream DFW VIII–X 90 MW · operating · Dallas
Sources
- Hut 8 Commences Construction of New Digital Asset Mining Site in Culberson County — GlobeNewswire, retrieved 2026-09-01
- Hut 8 optimizes self-mining operations as miners come online at Salt Creek — Hut 8, retrieved 2026-09-01
- Hut 8 Corp: Hut 8 Salt Creek — Datacenters.com, retrieved 2026-09-01
- Powered Lands data center map