Core Scientific Pecos Cottonwood
Reeves County, TX
Project details
Capacity 600 MW reported. Status Cottonwood Buildings 1–3 operating; AI Data Hall 1 planned. City . County Reeves. State TX. Grid ERCOT.
Overview
Core Scientific announced on 27 April 2026 a plan to scale its Pecos, Texas, campus to about 1.5 GW of gross power, or about 1.0 GW of leasable power. The company said it had begun transforming the campus, where 300 MW of gross power was then used for bitcoin mining, into an AI-infrastructure data-center campus. The first data hall had reached interior foundational footings, with precast walls arriving as the project moved toward vertical construction. Initial capacity was still expected in early 2027, and the site was available for lease. Core Scientific also said it had secured an incremental 300 MW of gross power under contract with its utility provider, a scalable behind-the-meter plan not counted in its previously announced leasable pipeline, and more than 200 acres of land. Data Center Dynamics reported the same incremental 300 MW, 1.5 GW gross and 1 GW leasable path, initial AI hosting in early 2027, and located Cottonwood 1 and 2 at 1939 Farm to Market 2119 in Reeves County, launched in 2022 with multiple buildings and an on-site substation. Company 1.5 GW figures are a longer-term strategy, not the public-map packaging of three 100 MW operating halls plus a 300 MW planned AI hall. Reeves County’s other mapped campus in this directory is Hut 8 Salt Creek.
The public map lists 4 map records. Reported campus capacity is 600 MW. Mix: 3 operating, 1 planned.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Core Scientific Pecos - AI Data Hall 1 | 300 MW | planned | 31.532751, -103.802086
- Core Scientific Pecos Cottonwood 1 - Building 2 | 100 MW | operating | 31.532755, -103.80523
- Core Scientific Pecos Cottonwood 1 - Building 3 | 100 MW | operating | 31.532759, -103.80419
- Core Scientific Pecos Cottonwood 1 - Building 1 | 100 MW | operating | 31.532745, -103.80627
Related
- Hut 8 Salt Creek 63 MW · operating · Reeves
- Cipher Odessa 207 MW · operating · Ector
- Texas Critical Ector 250 MW · planned · Ector
- AWS GW Ranch 4,000 MW · planned · Pecos
- Project Horizon 2,000 MW · planned · Pecos
- Hut 8 King Mountain 280 MW · operating · Upton
- Ionic Digital Cedarvale 234 MW · operating · Ward
- AWS Cipher Black Pearl 300 MW · planned · Winkler
- AWS Cipher Stingray 100 MW · planned · Andrews
- FO Permian Partners 150 MW · planned · Midland
- Cipher Colchis 1,000 MW · planned · Tom Green
- Meta El Paso 988 MW · planned · El Paso
- QTS Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- AWS Comanche Peak 715 MW · planned · Somervell
- crusoe abilene 900 MW · planned · Taylor
- stargate abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream DFW VIII–X 90 MW · operating · Dallas
Sources
- Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Pecos, Texas Campus — Core Scientific, retrieved 2026-09-01
- Core Scientific secures 300MW capacity at Pecos data center in Texas, looks to behind-the-meter power — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map