FO Permian Partners
Midland County, TX
Project details
Capacity 150 MW reported. Status planned. City . County Midland. State TX. Grid ERCOT.
Overview
Data Center Dynamics reported on 11 September 2025 that FO Permian Partners outlined plans to provide more than 5 GW of off-grid natural gas power to data centers in the Permian Basin and had secured a 320-acre plot in Midland County for a behind-the-meter gas platform with 150 MW of ready-now capacity. DCD said the 320 acres sit in a larger 3,200-acre tract with claimed access to more than 5 GW of gas supply, that phase one could be operational as early as 2026, and that the site is a collaboration with HiVolt Energy, which would operate custom reciprocating engines supported by a redundant battery system. Co-founder Jose Ortega said the model is meant to move operators from agreement to operation in months. The Midland Reporter-Telegram reported on 15 September 2025 that FO Permian and HiVolt had secured a 320-acre parcel 30 minutes southeast of downtown Midland under option. Davis Farish said the first phase has guaranteed initial delivery of 150 MW of behind-the-meter natural gas, possibly as soon as the following year, with expansion potential to multiple gigawatts. FO Permian’s own news page frames the platform as scalable off-grid Permian power. The Reporter-Telegram placed the optioned 320 acres 30 minutes southeast of downtown Midland and quoted Farish on 150 MW of behind-the-meter gas for phase one, with HiVolt running reciprocating engines and batteries. DCD and FO Permian’s news page both describe the 3,200-acre parent tract and more than 5 GW of claimed gas supply behind that first 150 MW plot.
The public map lists one map record, FO Permian Partners Data Center, 150 MW, planned. Reported campus capacity is 150 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- FO Permian Partners Data Center | 150 MW | planned | 31.76912, -101.898
Related
- Cipher Odessa 207 MW · operating · Ector
- Texas Critical Ector 250 MW · planned · Ector
- AWS Cipher Stingray 100 MW · planned · Andrews
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream Dfw Viii X 90 MW · operating · Dallas
Sources
- FO Permian Partners unveils 5GW off-grid gas power solution for Texas data centers — Data Center Dynamics, retrieved 2026-09-01
- Collaboration secures acreage to host data center in Midland County — Midland Reporter-Telegram, retrieved 2026-09-01
- Scalable. Off-Grid. Permian Powered. — FO Permian, retrieved 2026-09-01