Cipher Colchis Data Center | Tom Green County, TX
Data Center Dynamics reported on 3 November 2025 that Cipher had formed a joint entity to develop a 1 GW West Texas site named Colchis. Cipher was expected to provide most of the financing and about 95 percent equity ownership assuming standard lease and development terms in a future HPC lease. DCD said the 620-acre site includes a fully executed 1 GW direct-connect agreement with American Electric Power, which will construct the necessary dual interconnection facility for a targeted energization in 2028. CEO Tyler Page called Colchis Cipher’s most significant pipeline addition to date alongside two HPC transactions that quarter. Cipher Digital’s infrastructure page lists Colchis at 1,000 MW with an estimated 2028–29 energization, in the same pipeline stack as Mikeska and McLennan. Cipher’s Form 10-K for 2025 describes purchasing a majority interest in a joint venture to develop the 1 GW Colchis HPC site, a fully executed AEP direct interconnection for a dual facility targeting 2028, and options to buy about 620 acres adjacent to an existing substation. Compute Atlas indexes Cipher Colchis Campus in Tom Green County near San Angelo. Colchis is Cipher’s 1 GW Tom Green pipeline pin, not the operating Odessa hall and not Black Pearl’s AWS conversion.
The public map lists one building, Cipher Colchis, 1,000 MW, planned. Reported campus capacity is 1,000 MW.
Capacity 1000 MW reported. Status planned. City . County Tom Green. State TX. Grid ERCOT.
Buildings
- Cipher Colchis | 1000 MW | planned | 31.53101, -100.31897
Related
- Cipher Odessa
- Hut 8 King Mountain
- Ionic Digital Cedarvale
- AWS Cipher Stingray
- Texas Critical Ector
- FO Permian Partners
- AWS Cipher Black Pearl
- Meta El Paso
- QTS Turkey
- Stargate Milam
- Stargate Frontier
- AWS Comanche Peak
- crusoe abilene
- stargate abilene
- Stream DFW VIII–X
Sources
- AWS signs 300MW hosting deal to lease capacity from Cipher Mining — Data Center Dynamics, retrieved 2026-09-01
- Infrastructure — Cipher Digital, retrieved 2026-09-01
- Cipher Digital Inc. Form 10-K (FY2025) — U.S. Securities and Exchange Commission, retrieved 2026-09-01
- Cipher Colchis Campus — Compute Atlas, retrieved 2026-09-01
- Powered Lands data center map