Stream DFW VII Garland
Dallas County, TX
Project details
Capacity 60.2 MW reported. Status operating. City Garland. County Dallas. State TX. Grid ERCOT.
Overview
Stream Data Centers’ Dallas locations page says the company commissioned the first phase of its greenfield DFW VII hyperscale hall in January 2020 on a 23-acre site in Garland immediately adjacent to northeast Dallas, then expanded the building to 275,000 square feet and 43 MW of critical capacity. The expanded hall, coded DFWA1, is at 1813 Lookout Drive, Garland, Texas 75044, fully leased by a major cloud customer in 2023, with two utility feeds from a 95 MW on-site Oncor substation. Stream’s 14 January 2020 commissioning release named DFW VII as a 138,132-square-foot purpose-built hall expandable to about 400,000 square feet, with two 40 MW utility feeds from a new on-site Oncor substation and two diverse telco entrances. Data Center Map catalogs Stream DC DFW VII - Garland among Dallas listings. NTT Dallas TX4 maps another Lookout Drive hall in Garland. Stream DFW VIII-X is Stream’s live Dallas campus; QTS Irving and PowerHouse Irving sit in Irving; Crow Holdings / CleanArc Dallas is the Stemmons Corridor campus. Ellis County maps Red Oak and DataBank Red Oak on the southern corridor. 2 MW, operating. 2 MW, operating. 2 MW, operating. 2 MW, operating.
The public map lists one map record, Stream Data Center: DFW VII – Garland, 60.2 MW, operating. Reported campus capacity is 60.2 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Stream Data Center: DFW VII – Garland | 60.2 MW | operating | 32.98367, -96.65503
Related
- Crow Holdings / CleanArc Dallas 245 MW · planned · Dallas
- PowerHouse Irving 201 MW · planned · Dallas
- QTS Irving 341.6 MW · operating · Dallas
- GigaPOP Red Oak 540 MW · planned · Dallas
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas 333.9 MW · planned · Dallas
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- Stream DFW VIII-X 90 MW · operating · Dallas
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- DataBank Red Oak 168 MW · DFW10 operating; DFW13 planned · Ellis
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
Sources
- Dallas Area Data Center Solutions — Stream Data Centers, retrieved 2026-09-01
- Stream Data Centers Commissions New Hyperscale Data Center in Garland, Texas — Stream Data Centers, retrieved 2026-09-01
- Dallas Data Centers — Data Center Map, retrieved 2026-09-01
- Powered Lands data center map