QTS Irving
Dallas County, TX
Project details
Capacity 341.6 MW reported. Status operating. City Irving. County Dallas. State TX. Grid ERCOT.
Overview
QTS’s Irving 1 campus page lists a 56-acre master-planned campus with 165 MW-plus of critical capacity and six facilities, with DC1 and DC2 at 6431 Longhorn Drive, DC3 at 6351 Longhorn Drive, DC4 at 6311 Longhorn Drive, DC5 at 6300 Longhorn Drive, and DC6 at 6440 Longhorn Drive, Irving, Texas 75063. QTS describes a redundant campus fiber conduit system, LEED Gold certification, and renewable-sourced power, and points to Fort Worth, San Antonio, and South Dallas as its other Texas campuses. Data Center Dynamics reported on 29 March 2024 that QTS filed with TDLR for QTS DFW1-DC6 at 6300 Longhorn Drive in Irving: a two-story 210,755-square-foot partially built-out core and shell, $152 million, August 2024 to November 2025, HDR Architecture as design firm. DCD said the existing Irving facility at 6431 Longhorn Drive then offered 147 MW, with DC1 and DC2 spanning 700,000 square feet and 75.2 MW and DC3 spanning 415,900 square feet and 43 MW, and that QTS had re-filed DC5 as a $180 million, 264,000-square-foot hall. DCD later reported Irving City Council approved a 50 percent property-tax abatement for QTS’s three previously filed Irving projects, requiring occupancy of at least 500,000 square feet by 2028 and about $350 million invested by January 2029, covering DC3 on the 55-acre campus plus DC5 and DC6 at 6300 Longhorn Drive. PowerHouse Irving is the Customer Way campus in Irving; Stream DFW VIII-X is the live Dallas Stream campus.
The public map lists 4 map records. Reported campus capacity is 341.6 MW. All 4 buildings are operating.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- QTS Irving DC1 & DC2 | 105 MW | operating | 32.896965, -96.983
- QTS Irving DC3 | 60.2 MW | operating | 32.89486, -96.98184
- QTS Irving DC4 | 67.2 MW | operating | 32.89371, -96.98093
- QTS Irving DC5 | 109.2 MW | operating | 32.895195, -96.979706
Related
- Crow Holdings / CleanArc Dallas 245 MW · planned · Dallas
- PowerHouse Irving 201 MW · planned · Dallas
- Stream DFW VII Garland 60.2 MW · operating · Dallas
- GigaPOP Red Oak 540 MW · planned · Dallas
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas 333.9 MW · planned · Dallas
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- Stream DFW VIII-X 90 MW · operating · Dallas
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- DataBank Red Oak 168 MW · DFW10 operating; DFW13 planned · Ellis
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
Sources
- Irving — QTS Data Centers, retrieved 2026-09-01
- QTS files to build another data center at Dallas campus in Texas — Data Center Dynamics, retrieved 2026-09-01
- Microsoft to build four data centers in Irving, Texas — Data Center Dynamics, retrieved 2026-09-01
- QTS Irving DC3 Data Center in Dallas — Data Center Map, retrieved 2026-09-01
- Powered Lands data center map