Crow Holdings / CleanArc Dallas
Dallas County, TX
Project details
Capacity 245 MW reported. Status planned. City . County Dallas. State TX. Grid .
Overview
Crow Holdings announced on 20 January 2026 a 245 MW turnkey data-center campus on an urban infill site in central Dallas, with an initial 70 MW building expected in late 2027 developed together with CleanArc Data Centers on a currently vacant lot. Crow said the campus occupies about 40 acres along the Stemmons Corridor, near the Infomart at 1950 Stemmons Freeway and the interconnection hub at 2323 Bryan Street, and is planned for up to 245 MW with a dedicated on-site substation. Design work for the first hall is underway, with long-lead equipment procurement and substation planning in process. CleanArc announced on 9 February 2026 that it is master-planning the multi-building campus and leading development and leasing of Phase I, the 70 MW building slated for late 2027, and is coordinating the on-site substation. Data Center Dynamics reported the same 245 MW, 40-acre Stemmons Corridor partnership on 21 January 2026, placing CleanArc’s Texas expansion next to Crow’s $34 billion real-estate platform and a national pipeline Crow described as more than 3 GW under evaluation. The Dallas Morning News reported on 6 August 2026 that the 40-acre campus includes Market Hall parcels along North Stemmons Freeway and Market Center Boulevard, that city staff said data centers are generally classified as communications exchange facilities allowed in most mixed-use districts, that Crow held a predevelopment meeting for a communications exchange facility in October 2024, and that plans for Crow Market Hall — DC Phase I describe a five-story first building on a vacant parcel near 2300 N. Stemmons. Dallas County also maps QTS Irving, PowerHouse Irving, Stream DFW VII Garland, NTT Dallas TX4, and Stream DFW VIII-X.
The public map lists one map record, Crow Holdings / CleanArc Dallas Campus, 245 MW, planned. Reported campus capacity is 245 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Crow Holdings / CleanArc Dallas Campus | 245 MW | planned | 32.8044, -96.8334
Related
- PowerHouse Irving 201 MW · planned · Dallas
- QTS Irving 341.6 MW · operating · Dallas
- Stream DFW VII Garland 60.2 MW · operating · Dallas
- GigaPOP Red Oak 540 MW · planned · Dallas
- Stream Wilmer II
- QTS South Dallas DC3
- QTS South Dallas 333.9 MW · planned · Dallas
- PowerCampus Dallas Building 1 108 MW · planned · Dallas
- NTT Dallas TX4 50.4 MW · planned · Dallas
- Stream DFW VIII-X 90 MW · operating · Dallas
- Red Oak 209.1 MW · Building 1 operating; Building 2 planned · Ellis
- Midlothian 190 MW · planned · Ellis
- DataBank Red Oak 168 MW · DFW10 operating; DFW13 planned · Ellis
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
Sources
- Crow Holdings Announces 245MW Flagship Data Center Campus in Central Dallas — Crow Holdings, retrieved 2026-09-01
- CleanArc Data Centers Selected to Lead Development and Leasing for Crow Holdings’ 245MW Flagship Campus in Central Dallas — CleanArc, retrieved 2026-09-01
- CleanArc partners with Crow Holdings for 245MW campus in Dallas, Texas — Data Center Dynamics, retrieved 2026-09-01
- Can Crow Holdings build data center at Market Hall without rezoning? — Dallas Morning News, retrieved 2026-09-01
- Powered Lands data center map