Cipher Milsing
Grimes County, TX
Project details
Capacity 500 MW reported. Status planned. City . County Grimes. State TX. Grid .
Overview
Cipher Digital’s infrastructure page lists Milsing in the company’s grid pipeline at 500 MW with an estimated energization of 2030 or later. Cipher’s 4 August 2026 business update shows Milsing on the same 500 MW, 2030+ grid-pipeline timeline, subject to ERCOT’s batch process, alongside Colchis, McLennan, and Mikeska in the later-year stack. Cipher is pivoting from self-mining toward hyperscale HPC campuses. The Q2 2026 update describes a current portfolio of operating and contracted capacity plus a multi-gigawatt Texas pipeline expected to energize across 2027 through 2030 and beyond. Datacenter.fyi catalogs Cipher Mining Milsing as a public-record listing. Baxtel indexes Cipher Digital data centers as a company set that includes the Texas pipeline sites. Cipher McLennan and Cipher Mikeska are separate county pins on that same 500 MW, 2028-class pipeline; Milsing is the later Grimes County record. Cipher’s Q2 2026 exhibit charts Milsing in the 2030+ column of grid pipeline capacity, 500 MW gross, separate from 2027 Reveille and Ulysses and from 2028 Mikeska, McLennan, and Colchis. The infrastructure table uses the same 500 MW / 2030+ pair. Cipher presents Milsing as part of a roughly 5.3 GW operating, contracted, and pipeline mix across 11 sites, with pipeline megawatts subject to ERCOT’s batch process.
The public map lists one map record, Cipher Milsing, 500 MW, planned. Reported campus capacity is 500 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Cipher Milsing | 500 MW | planned | 30.65215, -95.95875
Related
- Cyrusone Freestone 760 MW · planned · Freestone
- Nexus Hubbard 5,630.3 MW · planned · Hill
- Knox Ranch 1,200 MW · planned · Hood
- Cipher Mclennan 500 MW · planned · McLennan
- Infrakey Lacy Lakeview 1,000 MW · planned · McLennan
- CyrusOne DFW10 400 MW · planned · Bosque
- Aws Comanche Peak 715 MW · planned · Somervell
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream Dfw Viii X 90 MW · operating · Dallas
Sources
- Cipher Digital Q2 2026 Business Update (SEC exhibit) — Cipher Digital, retrieved 2026-09-01
- Cipher Mining Milsing — datacenter.fyi, retrieved 2026-09-01
- Cipher Digital Data Centers — Baxtel, retrieved 2026-09-01
- Infrastructure — Cipher Digital, retrieved 2026-09-01
- Powered Lands data center map