QTS Phoenix II DC3

Maricopa County, AZ

Project details

Capacity 65.1 MW reported. Status operating. City Phoenix. County Maricopa. State AZ. Grid .

Overview

QTS Phoenix 2 is Blackstone-owned QTS’s 80-acre hyperscale campus on North 40th Street in central Phoenix, Maricopa County, Arizona, next to Sky Harbor International Airport. QTS’s Phoenix 2 page lists 210 MW-plus of critical campus capacity, purpose-built Freedom-design halls, and five addresses: PHX2 DC1 and DC2 at 1200 and 1250 N. 40th Street, DC3 at 1400 N. 40th Street, DC4 at 1450 N. 40th Street, and DC5 at 1500 N. 40th Street. Connect CRE reported a 2026 refinancing backed in part by PHX2DC2 and PHX2DC3, 36 MW and 45 MW of leased capacity, both online in 2024, with two hyperscale tenants on the five-building campus and QTS having broken ground on the fifth hall in 2023. datacenterHawk lists Phoenix II DC3 as a commissioned purpose-built colocation hall from 2024 with N+1 UPS and N+1 cooling and Salt River Project as the power provider. Maricopa siblings are Stack PHX02B and Stack PHX02C, STACK Infrastructure’s neighboring 40th Street campus. QTS’s separate Glendale Phoenix 3 park is already in this directory as QTS Phoenix 3 DC1. The public map lists DC3 as operating at 65.1 MW.

The public map lists one map record, QTS Phoenix II DC3, 65.1 MW, operating. Reported campus capacity is 65.1 MW.

Map records

Map entries are not a physical building count; campus and building scope may differ across sources.

Related

Sources