Aligned Phoenix PHX-07 Data Center | Glendale, AZ
Aligned Data Centers is building a 100-acre Glendale campus on former rose-farm land along North Reems Road in western Maricopa County. The City of Glendale announced an April 2025 groundbreaking for PHX-13 as one of four planned facilities on that campus, with a new 230 kV Arizona Public Service transmission line. Glendale described PHX-13 as a 72 MW hall using Aligned’s Delta³ air cooling and a closed-loop water system, and said converting the rose farm cut annual water use by more than 73 percent. Data Center Dynamics reported the same PHX-13 groundbreaking and placed PHX-07 at 8785 North Reems Road, due to go live later that year, with PHX-12 and PHX-14 also planned on the tract. DCD cited a Cushman and Wakefield note that Aligned acquired 100 acres at 8785 North Reems Road in Waddell in December 2024 for $86.5 million from LXP Industrial Trust. The public map lists PHX-07 as operating and PHX-13 as planned. Loop 101 and U.S. The City of Glendale’s PHX-13 groundbreaking names a 230 kV Arizona Public Service line and Aligned’s Delta³ air cooling with closed-loop water. DCD placed PHX-07 at 8785 North Reems Road on the 100 acres Aligned bought from LXP Industrial Trust for $86.5 million, with PHX-12 and PHX-14 also planned on that tract.
The public map lists 2 buildings. Reported campus capacity is 211.3 MW. Mix: 1 operating, 1 planned.
Capacity 211.3 MW reported. Status operating, planned. City Glendale. County Maricopa. State AZ. Grid .
Buildings
- Aligned Phoenix PHX-07 | 110.5 MW | operating | 33.563663, -112.38663
- Aligned Phoenix PHX-13 | 100.8 MW | planned | 33.5649, -112.3868
Related
Sources
- Aligned Data Centers Breaks Ground on Phx-13 Facility — City of Glendale, retrieved 2026-09-01
- Aligned breaks ground on data center in Phoenix, Arizona — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map