Capacity 500 MW reported. Status planned. City . County Travis. State TX. Grid ERCOT.
Overview
Data Center Dynamics reported that Cielo Digital Infrastructure is targeting a 500 MW development on 472 acres at Mustang Ridge, Texas, as part of a national site list that also includes a four-building Gaffney, South Carolina, campus of about 300 MW; a 500-acre Hudson, Colorado, site offering 750 MW; up to 500 MW on 146 acres on the Missouri side of Kansas City; 157 acres in Chisago, Minnesota, for a 300 MW campus; and 166 acres in Des Moines, Iowa, for 150 MW. The Texas line in that article is the Mustang Ridge acreage and megawatt figure used for this Travis County pin. Cielo’s properties page lists Mustang Ridge at up to 500 MW on 472 acres with 400 buildable acres. Cleanview catalogs Cielo Mustang Ridge Data Center as a planned 500 MW campus in Travis County developed by Cielo Digital Infrastructure on 472 acres. Travis County has no other campus in this directory batch; Williamson County’s PowerCampus Austin and SDC Austin are separate mapped pins north of Austin. This page is the Travis County Mustang Ridge pin, not Cielo’s South Carolina Gaffney campus.
The public map lists one map record, Cielo Mustang Ridge Data Center, 500 MW, planned. Reported campus capacity is 500 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Cielo Mustang Ridge Data Center | 500 MW | planned | 30.05179, -97.6772
Related
- PowerCampus Austin 600 MW · planned · Williamson
- Prominent Jarell 200 MW · planned · Williamson
- SDC Austin 84 MW · operating · Williamson
- CleanSpark Austin County 285 MW · planned · Austin
- EdgeConneX Austin 470.4 MW · planned · Bastrop
- Tract Caldwell Valley 4,000 MW · planned · Caldwell
- CloudBurst San Marcos 1,200 MW · planned · Hays
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Stargate Milam 1,200 MW · planned · Milam
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Cielo Digital Infrastructure plans 300MW data center campus in South Carolina — Data Center Dynamics, retrieved 2026-09-01
- Cielo Mustang Ridge Data Center — Travis, Texas — Cleanview, retrieved 2026-09-01
- Properties — Cielo Digital Infrastructure, retrieved 2026-09-01
- Powered Lands data center map