Capacity 4000 MW reported. Status planned. City . County Caldwell. State TX. Grid .
Overview
Tract’s Caldwell Valley project page lists the site as owned and in development in Texas on 2,973 acres with 4,000 MW of capacity. Tract describes a mega-campus between Austin and San Antonio at the intersection of transmission, natural gas, and long-haul fiber, with site energization in 2028, location on 345 kV transmission lines and the Kinder Morgan Permian Highway gas pipeline, and multiple campus options across the project. Tract frames the page as a high-level overview of basic features and current condition. Datacenters.com catalogs Tract Caldwell Valley as a data-center listing. Compute Atlas indexes the same facility as Tract Caldwell Valley Uhland, Texas. Tract says the park is uniquely suited for data-center investment and associated economic development and that further site specifics are available on request. The 4,000 MW capacity figure on Tract’s page is the sponsor’s published campus capacity for Caldwell Valley. Tract lists Caldwell Valley as owned rather than a third-party option, with 2,973 total acres and 4,000 MW published on the project page, site energization dated 2028, and an on-corridor location on 345 kV lines plus the Kinder Morgan Permian Highway gas pipeline. Tract says the overview covers current condition only and invites operators to request further site specifics. Compute Atlas’s Uhland, Texas, facility page and Datacenters.com’s Tract Caldwell Valley listing are the independent catalogs matching that sponsor campus.
The public map lists one map record, Tract Caldwell Valley, 4,000 MW, planned. Reported campus capacity is 4,000 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Tract Caldwell Valley | 4000 MW | planned | 29.92166, -97.759285
Related
- Cleanspark Austin County 285 MW · planned · Austin
- Edgeconnex Austin 470.4 MW · planned · Bastrop
- Cloudburst San Marcos 1,200 MW · planned · Hays
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream Dfw Viii X 90 MW · operating · Dallas
Sources
- Caldwell Valley — Tract, retrieved 2026-09-01
- Tract: Caldwell Valley Data Center — datacenters.com, retrieved 2026-09-01
- Tract Caldwell Valley Uhland TX — Compute Atlas, retrieved 2026-09-01
- Powered Lands data center map