Edged Project Atlas
Lehigh County, PA
Project details
Capacity 725.1 MW reported. Status planned. City South Whitehall. County Lehigh. State PA. Grid .
Overview
Edged is developing Project Atlas on about 410 acres of farmland at 2493 North Cedar Crest Boulevard in South Whitehall Township, Lehigh County, Pennsylvania, outside Allentown. Data Center Dynamics reported the company, through CDE Acquisitions LLC, originally proposed six halls and more than 5.1 million square feet with up to $9 billion invested, then scaled the plan to three buildings totaling about 1.5 million square feet and 725 MW, saying it will pay for power and infrastructure upgrades and dedicate about 160 acres to the Jordan Creek Greenway. WFMZ said the Lehigh Valley Planning Commission reviewed the three-building, 1.5 million-square-foot revision with an administration building, warehouse, and substation, plus a new road linking Cedar Crest Boulevard to Mauch Chunk Road. Lehigh Valley Public Media covered the scaled-back proposal before the township planning commission and said Edged pledged to cover infrastructure costs and highlighted closed-loop cooling with zero water usage on its project site. The public map lists three planned map records totaling 725.1 MW. South Whitehall is in the Lehigh Valley north of Philadelphia; Parkland High School sits across Cedar Crest Boulevard from the tract. WFMZ’s economic-benefit coverage said Edged projected more than $8.9 billion of investment, about $16.5 million a year in taxes, and a closed-loop cooling system, while residents packed South Whitehall planning meetings. Lehigh Valley Public Media said the planning commission must act by the end of October and scheduled further review at Parkland High School.
The public map lists 3 map records. Reported campus capacity is 725.1 MW. All 3 buildings are planned.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Edged Project Atlas - Building 1 | 241.7 MW | planned | 40.6421, -75.5382
- Edged Project Atlas - Building 2 | 241.7 MW | planned | 40.643616, -75.53651
- Edged Project Atlas - Building 3 | 241.7 MW | planned | 40.6451, -75.5348
Related
- AWS Keystone Trade Center 252.5 MW · planned · Bucks
- TECfusions Keystone Connect 3,000 MW · planned · Westmoreland
- Aligned Shippingport 3,600 MW · planned · Beaver
- Robena 910 MW · planned · Greene
- Gouldsboro 1,500 MW · planned · Lackawanna
- AWS Susquehanna 142 MW · operating, planned · Luzerne
- Nebius Highridge 400 MW · planned · Schuylkill
- Panther Creek 350 MW · planned · Carbon
- Homer City Energy Campus 4,500 MW · planned · Indiana
- PowerHouse PAX-1 225 MW · planned · Cumberland
Sources
- Edged eyes 725MW data center campus in Pennsylvania — Data Center Dynamics, retrieved 2026-09-01
- LVPC reviews revamped South Whitehall ‘Project Atlas’ data center plan — WFMZ, retrieved 2026-09-01
- Hyperscale data center back on the agenda in South Whitehall Township — Lehigh Valley Public Media, retrieved 2026-09-01
- Powered Lands data center map