Gouldsboro
Lackawanna County, PA
Project details
Capacity 1500 MW reported. Status planned. City Gouldsboro. County Lackawanna. State PA. Grid .
Overview
Gouldsboro is a planned data-center campus spanning Clifton and Covington townships in Lackawanna County, Pennsylvania. Data Center Dynamics, citing the Times-Tribune and Fox56, reported 1778 Rich Pike LLC aiming to develop a 1.5 GW, 1,000-acre campus on either side of Interstate 380 just north of Clifton Beach Road, known as the Gouldsboro Data Center in some documents. Plans described a potential 35-building campus, each hall about 125,000 square feet per floor and up to three floors, totaling between 4.4 million and 9.4 million square feet over about a decade, plus a gas plant and at least one on-site substation. Attorney Tony Maras, representing the developer, put the investment at an estimated $14.25 billion-plus. Quantm Group, LLC is listed as a development partner. Both townships were looking to amend zoning for data centers, and 1778 Rich Pike challenged Clifton’s proposed ordinances that could limit building heights and require extra permitting. Covington supervisors scheduled a zoning hearing on a data-center amendment for July 24, and Clifton’s zoning hearing board was set to hear the substantive challenge on July 29. Pennsylvania’s other mapped campuses in this directory include Aligned Shippingport, AWS Keystone Trade Center, Panther Creek, PowerHouse PAX-1, Robena, Homer City Energy Campus, and AWS Susquehanna.
The public map lists one map record, Gouldsboro Data Center, 1,500 MW, planned. Reported campus capacity is 1,500 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Gouldsboro Data Center | 1500 MW | planned | 41.2489, -75.51631
Related
- Panther Creek 350 MW · planned · Carbon
- AWS Susquehanna 142 MW · operating, planned · Luzerne
- Aligned Shippingport 3,600 MW · planned · Beaver
- AWS Keystone Trade Center 252.5 MW · planned · Bucks
- PowerHouse PAX-1 225 MW · planned · Cumberland
- Robena 910 MW · planned · Greene
- Homer City Energy Campus 4,500 MW · planned · Indiana