Capacity 780 MW reported. Status planned. City . County Loudoun. State VA. Grid .
Overview
Loudoun Now reported the Planning Commission rejecting Active Infrastructure’s Spring Valley Technology Park along Evergreen Mills Road, a roughly 3 million-square-foot data-center campus. Data Center Dynamics covered the same rejection alongside Loudoun County discussion of a moratorium on new data-center applications, citing about 3.25 million square feet. Loudoun Now’s earlier story described Active Infrastructure’s rezoning for data-center buildings on the Spring Valley site. The public map still lists Spring Valley Technology Park as a planned 780 MW pin. Greenlin Park is JK Land Holdings’ approved 300 MW campus south of Leesburg, a different Loudoun case from this Evergreen Mills rejection. CloudHQ Loudoun is the operating LC campus in Ashburn. Menlo Digital Sterling is the Pacific Boulevard project. Spring Valley is the Active Infrastructure Evergreen Mills Road filing, not Greenlin Park and not the LC campus. Loudoun Now said the commission rejected a roughly 3 million-square-foot campus; DCD put the same case at about 3.25 million square feet during a moratorium debate. The mapped Spring Valley pin remains planned at 780 MW after that planning-commission rejection along Evergreen Mills Road in Loudoun County.
The public map lists one map record, Spring Valley Technology Park, 780 MW, planned. Reported campus capacity is 780 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Spring Valley Technology Park | 780 MW | planned | 38.996162, -77.56861
Related
- Digital Dulles 319.2 MW · planned · Loudoun
- Aligned IAD02 163.1 MW · operating · Loudoun
- Aligned IAD03 143.1 MW · operating · Loudoun
- CloudHQ Loudoun 1,688.4 MW · operating, planned · Loudoun
- Greenlin Park 300 MW · planned · Loudoun
- Menlo Digital Sterling 144 MW · planned · Loudoun
- Equinix DC10 103.9 MW · operating · Loudoun
- STACK NVA04A 93.6 MW · operating · Loudoun
- Vantage VA2 124.8 MW · operating · Loudoun
- Corscale Kincora VA2 112 MW · planned · Loudoun
- Aligned IAD01 107.9 MW · operating · Loudoun
Sources
- Loudoun Planning Commission Rejects 3M-Square-Foot Data Center Campus — Loudoun Now, retrieved 2026-09-01
- Loudoun County considering moratorium on new data center applications, rejects 3.25 million sq ft campus — Data Center Dynamics, retrieved 2026-09-01
- Active Infrastructure Eyes 3M Square Feet of Data Centers Along Evergreen Mills — Loudoun Now, retrieved 2026-09-01
- Powered Lands data center map