Aligned IAD03
Loudoun County, VA
Project details
Capacity 143.1 MW reported. Status operating. City Sterling. County Loudoun. State VA. Grid .
Overview
Aligned Data Centers’ IAD-03 is the company’s Sterling, Virginia, hall at 22715 Relocation Drive, listed on Aligned’s Northern Virginia page with IAD-01 and IAD-02. Aligned describes a 26-acre campus setting, Tier III design, slab-on-grade and structured steel, 24x7 access, a 100 percent uptime SLA, Delta³ air cooling, closed-loop chilled water, and secondary loops for liquid cooling on dense GPU racks. The Virginia page also lists 3 MW backup generators, 2 MW UPS line-ups, N+1 topology, 500 kVA PDUs, 415 V dual distribution, near-zero water use from the closed loop, and a stack of SOC 2, PCI DSS, HIPAA, HITECH, NIST 800-53, and ISO 27001 certifications. Aligned IAD01 and Aligned IAD02 sit on Uunet Drive in Ashburn, the first two halls of Aligned’s Ashburn campus. IAD-03 is the Sterling Relocation Drive pin, not the Uunet Drive pair. Aligned markets the Virginia halls for AI, HPC, and cloud loads with mixed-density support. IAD-03 is the Sterling Relocation Drive pin at 143.1 MW operating, not the two Uunet Drive Ashburn halls. Aligned groups IAD-03 with IAD-01 and IAD-02 on the same Northern Virginia product page, with closed-loop chilled water aimed at high-density GPU deployments in Sterling rather than on Uunet Drive.
The public map lists one map record, Aligned IAD03, 143.1 MW, operating. Reported campus capacity is 143.1 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Aligned IAD03 | 143.1 MW | operating | 38.98862, -77.44075
Related
- Digital Dulles 319.2 MW · planned · Loudoun
- Aligned IAD02 163.1 MW · operating · Loudoun
- CloudHQ Loudoun 1,688.4 MW · operating, planned · Loudoun
- Greenlin Park 300 MW · planned · Loudoun
- Menlo Digital Sterling 144 MW · planned · Loudoun
- Spring Valley Technology Park 780 MW · planned · Loudoun
- Equinix DC10 103.9 MW · operating · Loudoun
- STACK NVA04A 93.6 MW · operating · Loudoun
- Vantage VA2 124.8 MW · operating · Loudoun
- Corscale Kincora VA2 112 MW · planned · Loudoun
- Aligned IAD01 107.9 MW · operating · Loudoun
Sources
- Fully Adaptive, AI-Ready Data Centers in Northern Virginia — Aligned, retrieved 2026-09-01
- Powered Lands data center map