Aligned IAD02
Loudoun County, VA
Project details
Capacity 163.1 MW reported. Status operating. City Ashburn. County Loudoun. State VA. Grid .
Overview
Aligned Data Centers’ IAD-02 is the second hall on the company’s 26-acre Ashburn campus at 21821 Uunet Drive in Loudoun County, Virginia, next to IAD-01 at 21890 Uunet Drive. Aligned’s Northern Virginia page lists IAD-01, IAD-02, and IAD-03 as Tier III halls with 24x7 access, a 100 percent uptime SLA, slab-on-grade and structured steel, Delta³ air cooling in dedicated galleries, closed-loop chilled water, and taps for liquid cooling on high-density GPU loads. Power design on the Virginia page includes 3 MW backup generators, 2 MW UPS line-ups, N+1 block redundancy, 500 kVA PDUs, and 415 V A+B distribution to racks, plus SOC 2 Type 2, PCI DSS, HIPAA, HITECH, NIST 800-53, and ISO 27001 certifications. Aligned IAD01 is Loudoun County’s other Uunet Drive Aligned pin. Aligned IAD03 is the Sterling hall at 22715 Relocation Drive, a separate Aligned address from this Uunet Drive campus. datacenterHawk catalogs Aligned’s Ashburn Uunet campus as a purpose-built multi-carrier facility. This page is the operating IAD-02 building, not IAD-01 and not the Sterling IAD-03 hall. Aligned markets the Virginia halls as AI- and cloud-ready with mixed-density support, sales-and-use tax exemptions on equipment, and fiber density in Data Center Alley west of Dulles. IAD-02 shares the 26-acre Uunet Drive campus with IAD-01; IAD-03 is a separate Sterling address.
The public map lists one map record, Aligned IAD02, 163.1 MW, operating. Reported campus capacity is 163.1 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Aligned IAD02 | 163.1 MW | operating | 39.01041, -77.47519
Related
- Digital Dulles 319.2 MW · planned · Loudoun
- Aligned IAD03 143.1 MW · operating · Loudoun
- CloudHQ Loudoun 1,688.4 MW · operating, planned · Loudoun
- Greenlin Park 300 MW · planned · Loudoun
- Menlo Digital Sterling 144 MW · planned · Loudoun
- Spring Valley Technology Park 780 MW · planned · Loudoun
- Equinix DC10 103.9 MW · operating · Loudoun
- STACK NVA04A 93.6 MW · operating · Loudoun
- Vantage VA2 124.8 MW · operating · Loudoun
- Corscale Kincora VA2 112 MW · planned · Loudoun
- Aligned IAD01 107.9 MW · operating · Loudoun
Sources
- Fully Adaptive, AI-Ready Data Centers in Northern Virginia — Aligned, retrieved 2026-09-01
- Aligned Data Centers IAD01 | 21890 Uunet Drive — datacenterHawk, retrieved 2026-09-01
- Powered Lands data center map