Stack DFW01C

Collin County, TX

Project details

Capacity 62.4 MW reported. Status planned. City Plano. County Collin. State TX. Grid ERCOT.

Overview

STACK Infrastructure’s Dallas–Fort Worth page lists two campuses totaling 580 MW on 240 acres. DFW01 in Plano is described as an established 80 MW north Dallas campus with two operational data centers, access to more than a dozen carrier networks, and 48 MW of expansion capacity. DFW02 in Lancaster is a separate 193-acre south Dallas campus marketed at up to 500 MW. The public map’s Stack DFW01C pin is the planned 62.4 MW Collin County expansion record on that Plano campus, inside the 48 MW of expansion capacity STACK publishes for DFW01. Data Center Map catalogs Dallas listings that include the STACK Plano campus. Plano DFW8 is the operating Collin map hall at 63.1 MW. Aligned DFW-04 North Star Road is Aligned’s 44-acre planned Plano hall at 601 North Star Road; Atlantic Station is Skybox and Prologis’s 64-acre, 100 MW Plano park on the former NTT site at 2300 West Plano Parkway. Stream DFW VIII-X is the live Dallas Stream campus. STACK’s Lancaster DFW02 campus is a different county pin from this Plano DFW01C record. Reported campus capacity on the public map is 62.4 MW planned.

The public map lists one map record, Stack DFW01C, 62.4 MW, planned. Reported campus capacity is 62.4 MW.

Map records

Map entries are not a physical building count; campus and building scope may differ across sources.

Related

Sources