Atlantic Station
Collin County, TX
Project details
Capacity 100 MW reported. Status planned. City Plano. County Collin. State TX. Grid ERCOT.
Overview
Skybox Datacenters lists Atlantic Station as a 64-acre industrial and data-center campus in the Dallas–Fort Worth metro with an on-site privately owned substation and up to 100 MW of power availability, in partnership with Prologis, and up to one million square feet of mission-critical space. Skybox says data-center use is allowed by right, that Oncor’s territory gives access to 100 percent renewable programs, that densities from 250 to 1,000 W per square foot and immersion and liquid-to-chip cooling are available, and that build-to-suit options run 12 to 24 months. Prologis markets Atlantic Station Phase 2 as mission-critical capacity on the same Plano park. Data Center Dynamics reported Skybox offering a 100 MW build-to-suit campus on the former NTT site at 2300 West Plano Parkway in Plano. The public map lists one planned Atlantic Station hall at 100 MW, matching Skybox’s power-availability figure. Aligned DFW-04 North Star Road is Aligned’s 44-acre Plano hall at 601 North Star Road; Stack DFW01C is STACK’s planned DFW01 expansion pin in Plano; Plano DFW8 is the operating Collin map record. Stream DFW VIII-X is the live Dallas Stream campus.
The public map lists one map record, Atlantic Station, 100 MW, planned. Reported campus capacity is 100 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Atlantic Station | 100 MW | planned | 33.004974, -96.74035
Related
- Aligned DFW-04 North Star Road 86.4 MW · planned · Collin
- Stack DFW01C 62.4 MW · planned · Collin
- Plano DFW8 63.1 MW · operating · Collin
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Atlantic Station, DFW Data Center — Skybox Datacenters, retrieved 2026-09-01
- Skybox offering 100MW build-to-suit campus in Plano, Texas — Data Center Dynamics, retrieved 2026-09-01
- Prologis Atlantic Station — Availability — Prologis, retrieved 2026-09-01
- Powered Lands data center map