Aligned DFW-04 North Star Road
Collin County, TX
Project details
Capacity 86.4 MW reported. Status planned. City Plano. County Collin. State TX. Grid ERCOT.
Overview
Aligned Data Centers lists DFW-04 at 601 North Star Rd, Plano, TX 75074, on a 44-acre campus designed to Tier III standards with slab-on-grade and structured steel, 24x7x365 access, and a 100 percent uptime SLA. The same Dallas page lists DFW-01 and DFW-02 at 2800 Summit Ave in Plano and DFW-03 at 3801 Britton Rd in Mansfield. Aligned describes air and liquid cooling, a closed-loop chilled-water design, and connectivity features including 3 MW backup generators and N+1 block-redundant topology. REBusinessOnline reported on 8 May 2025 that Aligned partnered with Lambda on a $700 million Plano project: Lambda will occupy DFW-04, a 425,000-square-foot hall anticipated in 2026, at 401 N. Star Road on 44 acres with an onsite substation and Aligned air and liquid cooling for high-density GPUs. The article placed DFW-04 within three miles of DFW-01 and DFW-02, Aligned’s headquarters campus, and noted DFW-03 underway in Mansfield. Data Center Map catalogs Aligned DFW-04 among Dallas listings. The public map lists one planned map record at 86.4 MW. Atlantic Station, Plano DFW8, and Stack DFW01C are the other Collin County campuses in this directory.
The public map lists one map record, Aligned DFW-04 North Star Road, 86.4 MW, planned. Reported campus capacity is 86.4 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Aligned DFW-04 North Star Road | 86.4 MW | planned | 33.006004, -96.6571
Related
- Atlantic Station 100 MW · planned · Collin
- Plano DFW8 63.1 MW · operating · Collin
- Stack DFW01C 62.4 MW · planned · Collin
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Sustainable, AI-Ready Data Centers in Dallas Fort Worth — Aligned, retrieved 2026-09-01
- Aligned Partners With Lambda on $700M Data Center Project in Plano — REBusinessOnline, retrieved 2026-09-01
- Aligned DFW-04 Data Center in Dallas — Data Center Map, retrieved 2026-09-01