Soluna Project Fei
Childress County, TX
Project details
Capacity 100 MW reported. Status planned. City . County Childress. State TX. Grid ERCOT.
Overview
Soluna’s announcement that it had surpassed one gigawatt of clean-computing projects launched Project Fei as a 100 MW data center colocated with a 240 MW utility-scale solar farm in northern Texas, the company’s second solar-based project, developed in partnership with a global energy-infrastructure investor to convert underutilized solar into high-performance computing. Soluna’s FY2025 Form 10-K lists Fei in Childress County at 100 MW in development for Bitcoin hosting or AI/HPC on solar and said the company had signed a term sheet for power while land acquisition, power-contract negotiation, and ERCOT interconnection planning continued. The July 2026 monthly update said Soluna had secured the Fei land, was finalizing PSA negotiations, and had begun capital-formation and construction-design work as ERCOT interconnection studies neared completion. A May 2026 update said Fei was advancing outside ERCOT’s Large Flexible Load batch on a sub-75 MW interconnection pathway to shorten the development timeline. Soluna’s Q2 2026 highlights later said Fei had grown from 120 MW to 240 MW and was designated for AI workloads; the mapped Childress County hall remains 100 MW. IREN Childress is the operating 750 MW campus in the same county, where IREN delivered Horizon 1 to Microsoft under a $9.7 billion, 200 MW IT-load contract.
The public map lists one map record, Soluna Project Fei, 100 MW, planned. Reported campus capacity is 100 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Soluna Project Fei | 100 MW | planned | 34.37431, -100.094
Related
- Iren Childress 750 MW · operating · Childress
- Meta El Paso 988 MW · planned · El Paso
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Aws Comanche Peak 715 MW · planned · Somervell
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream Dfw Viii X 90 MW · operating · Dallas
Sources
- Soluna Surpasses One Gigawatt of Clean Computing Projects with Launch of Two New Sites — Soluna, retrieved 2026-09-01
- Soluna Holdings Form 10-K for the year ended December 31, 2025 — SEC EDGAR, retrieved 2026-09-01
- Soluna Announces Monthly Business Update — Soluna, retrieved 2026-09-01
- Soluna Announces Monthly Business Update (May 2026) — Soluna, retrieved 2026-09-01
- Soluna Presents Q2 2026 Highlights & Business Update — Soluna, retrieved 2026-09-01
- Soluna Announces Monthly Business Update (May 2026) — Soluna, retrieved 2026-09-01
- Powered Lands data center map