IREN Childress
Childress County, TX
Project details
Capacity 750 MW reported. Status operating. City . County Childress. State TX. Grid .
Overview
IREN’s Childress page lists 750 MW of total capacity on 576 acres in Childress, Texas, with dual fiber paths and on-site substations owned by IREN, connected to ERCOT. IREN announced a multi-year Microsoft agreement valued at about $9.7 billion to deliver GPU cloud infrastructure in liquid-cooled data centers under construction at the 750 MW Childress campus. GPUs deploy in four phases through 2026 (Horizon 1 through 4) for 200 MW of critical IT load on a five-year contract with 20 percent prepayment, expected to contribute roughly $1.94 billion in annualized run-rate revenue once fully commissioned. IREN also entered an agreement with Dell to purchase GPUs and ancillary equipment for about $5.8 billion. Data Center Dynamics reported on 17 August 2026 that IREN delivered Horizon 1, the first of four 50 MW IT-load direct-to-chip liquid-cooled buildings for Microsoft at Childress, and that at full build-out Childress is set to offer 750 MW across 576 acres, previously used for cryptomining. Co-CEO Daniel Roberts credited more than 3,000 people on the site team and said Horizons 2 through 4 were scheduled later in 2026. The public map lists one operating map record, IREN Childress (Bitcoin mining), at 750 MW. Soluna Project Fei is Childress County’s other mapped campus.
The public map lists one map record, IREN Childress (Bitcoin mining), 750 MW, operating. Reported campus capacity is 750 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- IREN Childress (Bitcoin mining) | 750 MW | operating | 34.382473, -100.05569
Related
- Soluna Project Fei 100 MW · planned · Childress
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Childress Data Center | 750MW AI-Optimised Facility — IREN, retrieved 2026-09-01
- IREN Signs $9.7 Billion Agreement with Microsoft to Deploy AI Cloud Infrastructure — IREN, retrieved 2026-09-01
- Iren delivers first phase of AI capacity to Microsoft in Texas — Data Center Dynamics, retrieved 2026-09-01
- Powered Lands data center map