CyrusOne DFW1
Denton County, TX
Project details
Capacity 126 MW reported. Status operating. City Carrollton. County Denton. State TX. Grid ERCOT.
Overview
CyrusOne’s Carrollton DFW1 page describes the Frankford Road facility as the company’s operating Dallas-area campus in Carrollton, Texas. The public map lists one operating map record, CyrusOne DFW1, at 126 MW in Denton County. Data Center Map catalogs the hall among Dallas listings alongside other North Texas pins. DFW1 is CyrusOne’s mapped Carrollton campus, separate from later Texas halls the company has announced in Fort Worth and Bosque County. Core Scientific Denton is the other Denton County campus: Core Scientific’s site page puts 394 MW of total power on a 78-acre footprint at 8171 Jim Christal Road, Denton, Texas 76207, and Construction Review Online reported Denton City Council expanding the city land lease to 78 acres and 394 MW as the bitcoin-mining site converts to an AI campus targeting 2027 completion. Stream DFW VIII-X is the live Dallas Stream campus. QTS Irving operates the Longhorn Drive campus and PowerHouse Irving is the 201 MW Customer Way campus just south in Dallas County. The Frankford Road hall remains the operating Denton County CyrusOne record on the public map, reported at 126 MW, matching the CyrusOne Carrollton listing Data Center Map indexes for Dallas.
The public map lists one map record, CyrusOne DFW1, 126 MW, operating. Reported campus capacity is 126 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- CyrusOne DFW1 | 126 MW | operating | 32.992096, -96.93034
Related
- Core Scientific Denton 394 MW · 3 operating; 3 planned · Denton
- Stream DFW VIII-X 90 MW · operating · Dallas
- Crusoe Abilene 900 MW · planned · Taylor
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Milam 1,200 MW · planned · Milam
- QTS Turkey 999.9 MW · planned · Hall
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
Sources
- Carrollton, TX: DFW1 | CyrusOne — CyrusOne, retrieved 2026-09-01
- Dallas Data Centers — Data Center Map, retrieved 2026-09-01
- Powered Lands data center map