Project Dorothy 1
Briscoe County, TX
Project details
Capacity 50 MW reported. Status operating. City . County Briscoe. State TX. Grid ERCOT.
Overview
Soluna’s November 13, 2025, newsroom post says Project Dorothy in West Texas includes Dorothy 1 and Dorothy 2 behind the meter at a 150 MW wind farm, and that completing Dorothy 2 brought the named Dorothy campus to about 100 MW of operational capacity. Dorothy 1 is the earlier operating hall on that campus. Soluna said the site converts curtailed wind into Bitcoin mining and AI compute, that Dorothy 1 and 2 together were then running about 98 MW of Bitcoin mining split between 25 MW proprietary and 73 MW hosting, and that the transition created 18 full-time local jobs. The company names the campus for NASA mathematician Dorothy Vaughan. Data Center Dynamics reported the same 48 MW Dorothy 2 expansion that brought the campus to 100 MW, with Dorothy 1 as the earlier operating phase. Soluna’s August 24, 2026, land-purchase release places Dorothy 1 and 2 in Briscoe County adjacent to the Briscoe Wind Farm, which Soluna acquired in April, and says a newly closed 397-acre parcel next door will host planned Dorothy 3. This page is the operating Dorothy 1 pin, not Dorothy 2’s expansion hall and not the Dorothy 3 land purchase.
The public map lists one map record, Project Dorothy 1, 50 MW, operating. Reported campus capacity is 50 MW.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- Project Dorothy 1 | 50 MW | operating | 34.432266, -101.2372
Related
- Crusoe Abilene 900 MW · planned · Taylor
- Meta El Paso 988 MW · planned · El Paso
- AWS Comanche Peak 715 MW · planned · Somervell
- Qts Turkey 999.9 MW · planned · Hall
- Stargate Milam 1,200 MW · planned · Milam
- Stargate Frontier 1,820 MW · planned · Shackelford
- Stargate Abilene 1,200 MW · Buildings 1–2 operating; 3–8 planned · Taylor
- Stream DFW VIII-X 90 MW · operating · Dallas
Sources
- Soluna Completes Project Dorothy 2, Increasing Operational Capacity by 64% to 123 MW — Soluna, retrieved 2026-09-01
- Soluna completes expansion of Project Dorothy 2 site in West Texas, adding 48MW — Data Center Dynamics, retrieved 2026-09-01
- Soluna Closes Purchase of 397 Acres for Project Dorothy — Soluna, retrieved 2026-09-01
- Powered Lands data center map