AWS Madison Mega Site
Madison County, MS
Project details
Capacity 206.4 MW reported. Status operating. City Canton. County Madison. State MS. Grid .
Overview
Amazon’s Madison Mega Site is the Canton half of AWS’s Madison County, Mississippi, data-center program, on Nissan Parkway and Highway 22 at the more-than-1,000-acre industrial park that also holds an Amazon fulfillment center; the other half is AWS Ridgeland. Amazon’s January 2024 $10 billion announcement named two Madison County industrial parks and at least 1,000 jobs as the largest capital investment in state history. Data Center Dynamics later reported the statewide commitment rising to $25 billion, with Madison County’s Project Atlas at $11 billion on about 1,700 acres and Entergy Mississippi supplying power. Mississippi Today quoted AWS in June 2026 that five buildings were already operating at Canton with plans to at least double that presence, that Canton was using Canton Municipal Utilities water and would switch in 2027 to recycled wastewater from the Madison County Wastewater Authority via a Veolia partnership, about 83 million gallons a year, and that Amazon is raising CMU capacity 39 percent and Beatties Bluff treatment capacity 50 percent. A later Mississippi Today tax story said AWS challenged Madison County’s valuation of those five Canton buildings, the assessor at $292 million each versus Amazon’s $69 million, and that the Board of Supervisors sided with the assessor. The public map lists three operating 68.8 MW map records totaling 206.4 MW. Mississippi Today’s water story is the Canton-specific offtake: potable from Canton Municipal Utilities now, recycled wastewater from Beatties Bluff in 2027, and Amazon’s pipeline from the Big Black River wastewater stream. The August 2026 tax-valuation fight is the first public dollar figure on the five operating Canton buildings that the public map samples as three 68.8 MW halls.
The public map lists 3 map records. Reported campus capacity is 206.4 MW. All 3 buildings are operating.
Map records
Map entries are not a physical building count; campus and building scope may differ across sources.
- AWS Madison Mega Site Building 1 | 68.8 MW | operating | 32.594467, -90.09798
- AWS Madison Mega Site Building 2 | 68.8 MW | operating | 32.596073, -90.09798
- AWS Madison Mega Site Building 3 | 68.8 MW | operating | 32.59446, -90.09442
Related
- AWS Ridgeland 222.9 MW · planned · Madison
Sources
- AWS plans to invest $10 billion in Mississippi — About Amazon, retrieved 2026-09-01
- AWS scales up investment commitment for Mississippi data centers to $25bn — Data Center Dynamics, retrieved 2026-09-01
- Where do Amazon’s data centers in Mississippi stand? — Mississippi Today, retrieved 2026-09-01
- Amazon challenge of data centers' value could reduce tax payments to Madison County by millions — Mississippi Today, retrieved 2026-09-01
- Powered Lands data center map